The  LOOP  +IN  and  Loop  +OUT  (loop  positive  in  and  out)  connections  are  automatically  joined  together  (short 
circuit)  by  a  spring  arm  between  terminals  2  and  3  until  the  detector  is  installed.  This  allows  for  cable  continuity 
readings at the commissioning stage. Please remember that all high voltage testing must be carried out before the 
installation of the electronics, otherwise the electronics will be damaged. Please also note that the SCRN terminal 
should only be connected to the loop screen and NOT the building earth. 
 
 
Once all testing has been carried out on the cabling and 

continuity & insulation

 has been proven, the Multipoint 

ASD unit may be assembled. 

 

 

 

Schematic

 

 

 

 

 

 

 

 

Technical Support 

 

Contact your supplier for technical support on this product. 

Due to the complexity and inherent importance of a life risk type system training on this equipment is essential, and 
commissioning  should  only  be  carried  out  by  competent  persons.  Fike  cannot  guarantee  the  operation  of  any 
equipment unless all documented instructions are complied with, without variation.  
 
Fike’s policy is one of continual improvement and the right to change a specification at any time without notice is 
reserved. Whilst every care has been taken to ensure that the contents of this document are correct at time of 
publication, Fike shall be under no liability whatsoever in respect of such contents. E&OE 

 