26-0981 Issue 2
The LOOP +IN and Loop +OUT (loop positive in and out) connections are automatically joined together (short
circuit) by a spring arm between terminals 2 and 3 until the detector is installed. This allows for cable continuity
readings at the commissioning stage. Please remember that all high voltage testing must be carried out before the
installation of the electronics, otherwise the electronics will be damaged. Please also note that the SCRN terminal
should only be connected to the loop screen and NOT the building earth.
Once all testing has been carried out on the cabling and
continuity & insulation
has been proven, the Multipoint
ASD unit may be assembled.
Schematic
Technical Support
Contact your supplier for technical support on this product.
Due to the complexity and inherent importance of a life risk type system training on this equipment is essential, and
commissioning should only be carried out by competent persons. Fike cannot guarantee the operation of any
equipment unless all documented instructions are complied with, without variation.
Fike’s policy is one of continual improvement and the right to change a specification at any time without notice is
reserved. Whilst every care has been taken to ensure that the contents of this document are correct at time of
publication, Fike shall be under no liability whatsoever in respect of such contents. E&OE