Field Controls CK-43 Instruction Manual Download Page 4

 

Page 4

D

RAFT 

C

ONTROL 

I

NSTALLATION IN 

T

YPE 

B V

ENT 

P

IPE

 

CAUTION:

 

DO NOT use the supplied collar when mounting draft 

control to Type B Vent Pipe. Install by using a Type B Vent Pipe Tee.

 

1.  Install a vent pipe reducer or increaser into the inner pipe and  

fasten using sheet metal screws. (See  Figures 6 & 7) 

2.  The opening of the Type B Vent Tee, at the draft control mounting 

location,  should be sealed with a high temper-  ature sealant or 
equivalent. 

3.  Refer to Insertion of Draft Control Section. 

I

NSERTION OF 

D

RAFT 

C

ONTROL 

S

ECTION

 

Insert the draft control into the collar or tee. The front face of the 
control MUST be plumb and the bearing surfaces MUST be level 
whether the control is on a horizontal, vertical or sloping flue pipe. 
Use a spirit level and level accurately. (See Figures 6 & 7) Secure 
the control in the collar by tightening the clamping screws. If a tee is 
used or a collar is supplied locally, the control may be held in place 
by sheet metal screws. 

ADJUSTMENTS 

A

DJUSTING THE 

D

RAFT 

C

ONTROL WITH 

4" MG1 

The control MUST be adjusted to the desired draft setting by adding 
or removing the washer-type weights supported by the two chains on 
the side of the draft control. (See Figure 8) DO NOT move the weight 
attached directly to the gate, this is used only for balancing at the 
factory. 

A

DJUSTING THE 

D

RAFT 

C

ONTROL WITH 

5" AF 

Vertical Flues Mounting - 

The control is shipped for installation in a 

vertical flue. The adjustment weight should be in the right hand slot 
when you face the control. See Figure 9. 

Horizontal Flues Mounting -

 For hori-zontal flues, remove the 

weight from the right hand slot and attach it to the left hand slot as 
shown in Figure 9. 

What Draft Setting to Use - 

When adjusting the control, two things 

are essential: 

1.  The burner must be operating for at least 10 minutes to obtain 

maximum chimney draft. 

2.  An analysis of the flue gases is  necessary to determine the 

percentage  of CO

2

 and check for presence of CO.  Refer to the appliance instructions and/or to the local 

gas company for the proper CO

2

 readings and allowable CO  levels. A rule of thumb for draft  setting is 

between .01" to .03" of water column draft at the appliance outlet. (Check equipment requirement.)  

Changes in the adjustment of the 4" MG1 control should be made by adding or removing the washer-like 
weights (supplied with the control) to or from the weight holder chain assembly. After the control is adjusted, 
it's action will be entirely automatic, the gate will open or close by itself to correct for changes in the draft that 
occur in the chimney. 

Figure 7

Figure 6

Figure 8

Figure 9

Summary of Contents for CK-43

Page 1: ...luminum tubing 1 1 4 inch tubing connector 1 Flexible conduit connector 1 4 MG1 Barometric Draft Control or 5 AF Barometric Draft Control This device MUST be installed by a qualified agency in accordance with the manufacturers installation instructions The definition of a qualified agency is any individual firm corporation or company which either in person or through a representative is engaged in...

Page 2: ... the CK 43 junction box or installer supplied junction box onto the wall or floor joist without straining the flexible conduit Fasten the CK 43 junction box through the four dimpled locations on the base of the box See Figure 3 PRESSURE SWITCH SENSING TUBE INSTALLATION 1 Attach the 1 4 inch tubing connector to the pressure tube on the SWG Venter See Figure 3 2 Connect the supplied 1 4 aluminum tub...

Page 3: ... at the front corners of the collar Bend 90 degrees 1 4 inch behind the single hole on the straps 2 Insert clamping screw in ears on collar and bolt the remainder of the collar together 3 Hold the collar against the side of the flue in the exact position it is to be installed shown by dotted lines and mark the outline of the collar on the flue 4 Cut a hole in the flue about 1 2 inside of this outl...

Page 4: ...e 8 DO NOT move the weight attached directly to the gate this is used only for balancing at the factory ADJUSTING THE DRAFT CONTROL WITH 5 AF Vertical Flues Mounting The control is shipped for installation in a vertical flue The adjustment weight should be in the right hand slot when you face the control See Figure 9 Horizontal Flues Mounting For hori zontal flues remove the weight from the right ...

Page 5: ...the timer adjustment counterclockwise For timer that looks like Figure 12 Rotate the timer adjustment on the timer counterclockwise to increase the operation time To decrease the operation time rotate the timer adjustment clockwise Typical post purge time should be between 3 to 5 min WIRING CAUTION Disconnect electrical power when wiring power venter NOTE If using this control kit with an electron...

Page 6: ...nter operating a Check pressure switch adjustment b Check wiring connections between pressure switch and burner c Check pressure switch for conti nuity across terminals during venter operation 2 Venter does not activate when thermostat calls for heat a Check wiring b Check relay for proper operation 3 Flue gas odor a Check system draft b Check for negative pressure in building c Check post purge t...

Page 7: ..._ INSTALLER S NAME _____________________________________________________ INSTALLER S COMPANY _________________________________________________ INSTALLER S PHONE NO ________________________________________________ DATE OF INSTALLATION _________________________________________________ CK 43 Control Kit ...

Page 8: ...Page 8 P N 46190700 Rev D 11 07 ...

Reviews: