background image

 

Page 4

INSTALLATION INSTRUCTIONS FOR USE WITH AN AIR 
BOOSTER 

1.  Follow steps 1 through 7 indicated in the previous section. 

2.  Refer to the wiring diagram to determine the proper wiring 

connections. Attach all of the wires as indicated in the 
diagram. Secure the box cover to the box when complete. 
(See Figure 9) 

3.  The Air Booster Activator installation is now complete. Switch 

the furnace power supply “ON”. 

4.  Continue with step 12 indicated in the previous section. Any 

reference to the humidifier should be replaced with air-
booster. 

5.  Adjust the thermostat such that it is no longer calling for 

heat. Check the shut-down sequence. The burner should 
cease operation first. The air-booster should shut off shortly 
after the blower stops. 

NOTE:

 

The Air Booster Activator supplies electricity to the air-

booster only when air flows in the plenum. This prevents air-
booster operation when the blower is off. 

NOTE:

 This Air Booster Activator can be installed on a 120 VAC 

TM-90R Humidifier. Follow the instructions stated for the TM-
90R/TM-2000 except for the wiring diagrams. Refer to the wiring 
diagram shown in Figure 10 for proper wiring connections. 

Figure 10

Figure 9

Summary of Contents for 46262500

Page 1: ...dance to the National Electrical Code NEC 14 GA Romex or conduit cable ITEMS INCLUDED 1 Differential Air Pressure Switch 1 O D Tube Clamp 1 Butt Splice 2 Female Quick Connect Terminal 1 Instruction Sh...

Page 2: ...s supplied with this kit See Figure 1 3 Bend a U shape in one end of the aluminum flow sensing tube See Figure 2 4 a If the furnace DOES NOT have an air conditioner A coil at the warm air outlet of th...

Page 3: ...ce blower and humidifier If each appears to function correctly proceed to step 13 If the TM 90R TM 2000 humidifier does not activate after a reasonable period of time it is possible that the air press...

Page 4: ...he humidifier should be replaced with air booster 5 Adjust the thermostat such that it is no longer calling for heat Check the shut down sequence The burner should cease operation first The air booste...

Page 5: ...icale Marquer les quatre trous de montage en se servant de la plaque de montage du pressostat comme gabarit Les trous pour vis peuvent tre pr perc s avec un embout de perceuse de 1 8 po ou moins Penda...

Page 6: ...ificateur Si chaque appareil semble fonctionner correctement passer l tape 13 Si l humidificateur TM 90R TM 2000 ne s active pas apr s un d lai raisonnable il est possible que le pressostat d air n ai...

Page 7: ...e par pulv risateur d air 5 R gler le thermostat de fa on qu il ne demande plus de chaleur V rifier la s quence d arr t Le br leur devrait s arr ter en premier Le pulv risateur d air devrait s arr te...

Page 8: ...como plantilla Los orificios de los tornillos se pueden taladrar con anticipaci n usando una broca de 1 8 o m s peque a Tenga cuidado cuando perfore los orificios para evitar da ar las estructuras in...

Page 9: ...no parece funcionar correctamente contin e con el paso n mero 13 Si el humidificador TM 90R TM 2000 no se activa despu s de un per odo de tiempo razonable es posible que el conmutador de presi n de ai...

Page 10: ...zada con reforzador de aire 6 Ajuste el termostato para no requiera m s calor Verifique el orden de cierre El quemador deber dejar de funcionar primero El reforzador de aire se apagar poco despu s de...

Page 11: ...Page 11...

Page 12: ...Page 12 PN 46262500 Rev D 08 04...

Reviews: