The AN6001-G16 can be installed in a 19-inch cabin
(404000068 to 404000071 and 404000596 to 40400
A cabinet can house three AN6001-G16s at mos
Keep a distance of 50 mm between two equipme
Rules for Arranging the Equipment
5.1
Equipment Layout
5
Installing Equipment
Instruction
a distance of 1 U when they are installed in a 19-
between the equipment bottom and the cabinet b
cement floor or an ESD protection raised floor in
The equipment is mounted on the front vertical m
The distance between every three mounting hole
cabinet is 1 U (44.45 mm).
The distance between every two mounting holes
cabinet is 1 SU (25 mm).
Equipment Layout
5
5
Instruction
The minimum reserved space can be equipped with
net (4102596 to 4102599) or a 21-inch cabinet
00599).
st.
ent sets when they are installed in a 21-inch cabinet or
-inch cabinet. Keep a distance of more than 100 mm
bottom lintel, so that the cabinet can be mounted on a
the equipment room.
mounting flanges in both 19-inch and 21-inch cabinets.
es on the front vertical mounting flange in a 19-inch
on the front vertical mounting flange in a 21-inch
5
5
h an external fiber guide slot.