![FHM FH-DW30 Operation And Parts Manual Download Page 16](http://html1.mh-extra.com/html/fhm/fh-dw30/fh-dw30_operation-and-parts-manual_2285703016.webp)
4 ASSEMBLING
The machine comes from the factory in a shipping
configuration. Always use tools equipment and
forklifts of appropriate size and capacity for the job.
Always use 2 men when lifting, moving and
assembling the machine.
When the machine is shipped, follow this proce-
dure when preparing for the customer:
1. Clear the area of bystanders especially small
children before starting.
2. Use a forklift to lift the pallet/machine from the
truck. Carry the load close to the ground.
3. Move the machine to the assembly area. Be
sure there is sufficient clearance to access the
machine from all sides.
4. Cut the tie-down straps.
5. Lay-out components next to machine.
6. Use a forklift to raise and lift the frame.
7. Or alternatively attach a lifting device to the
SHIPPING
lifting bracket on top of the frame.
8. Remove pallet and place machine on the
ground.
9. Release feed hopper transport latch and lower
hopper into the working position. Stow anchor
latch.
13
FH-DW30
Summary of Contents for FH-DW30
Page 13: ...10 FH DW30 ...
Page 14: ...11 FH DW30 ...
Page 31: ...DW30 Wood Chipper FH DW30 ...
Page 32: ...FH DW30 ...
Page 33: ...FH DW30 ...
Page 37: ...FARMER HELPER MACHINERY REGISTRATION ...
Page 38: ......