© FAR GROUP EUROPE
e
F
en
F : UNDER PRESSURE PROCEDURE
(except 112495: Gaz pre load model)
e
• Unscrew the 3 caps.
( flat keys 13 & 19 ) 55
1
2
e
F
• Unscrew the closing valve by one turn
(Allen screw).
3
4
e
F
• • Open the 2 valves completely using an
Allen hexagonal wrench.
e
F
g
• Put Teflon around the thread and screw the
3 caps. ( flat keys 13 & 19) 56 : First test
5
• Press on the valve and purge for 13
seconds maximum
g
e F
112503-112511-new.indd 45
18/12/07 16:52:47