Fetco E1251IN-1B140-PM110 Users Manual And Operator Instructions Download Page 7

Go to fetco.com for the latest versions of all information         

Page 7

      

User Guide & Operator instructions

   

P213

e0

 NOVEMBER 2021

 

A Program 

 

Menu Features: Batch Parameters

 

The settings below are shown for the top batch on a single brewer top left button on a twin brewer. 

See how to access all A menus on the previous page.  Below are the brew settings for default A1 & A2  batches 

POSITION  Program Items 

Factory set Default  Programming Range  Increments 

Notes 

A1.10 

Batch Volume 

1.5 gal 

6.8 liters 

0.51 to 2.00 gal 

1.93 to 7.57L 

0.01G 

0.05L 

 

A1.10 

Batch Volume 

CBS-2153 only 

2 gallons 

9.1 liters 

0.51 to 2.66 gal 

1.93 to 10.1L 

0.01G 

0.05L 

 

A1.20 

Brew Time 

5:00 minutes 

2:00 – 12:00 

0.30 

Default total brew time is 6:30 

minutes 

A1.30 

Prewet Perc. 

0% 

0.00 – 25.0% 

1% 

Percentage of total brew 

volume 

A1.40

 

Prewet Delay 

 

(Pause after prewet 

completes) 

0% [1:00 Min] 

[0:10 – 5:00] 

1:00 min 

The time between prewetting 

and start of brew cycle. 

This feature appears ONLY 

if Prewet >0:00 

A1.50 

Bypass Percent 

CBS-1251:10% 

CBS-1252/3:15% 

0% – 40% 

1% 

Diverts brewing water from 

brew process 

A1.60 

 

This is a 

Safety 

Feature

 

Drip Delay 

1:30 mm:ss 

0:30 – 6:00 Min. 

 

Time that brew basket remains 

locked during final drip-out 

Drip delay remains “ON” for 

1:30 minutes if STOP  is 

pressed during brew† 

 

 

 

 

 

A2.00 

BATCH 

ENABLED 

YES 

(Active) 

Middle and Bottom 

batches A2,3,5,6 

Batch  

on or off 

Batches may be individually 

enabled, rewritten or 

deactivated 

A2.10 

Batch Volume 

1.5 gal 

6.8 liters 

0.51 to 2.00 gal 

1.93 to 7.57L 

0.01G 

0.05L 

 

A2.10 

Batch Volume 

CBS-2153 only 

2 gallons 

9.1 liters 

0.51 to 2.66 gal 

1.93 to 10.1L 

0.01G 

0.05L 

 

A2.20 

Brew Time 

4.00 minutes 

2:00 – 12:00 

0.30 

Default total brew time is 5:30 

minutes 

A2.30 

Prewet Perc. 

0% 

0.00 – 25.0% 

1% 

Percentage of total brew 

volume 

A2.40

 

Prewet Delay 

(Brew pause after 

prewet completes) 

0% [1:00 Min] 

[0:10 – 5:00] 

1:00 min 

The time between prewetting 

and start of brew cycle. 

This feature appears ONLY 

if Prewet >0:00 

A2.50 

Bypass Percent 

CBS-1251:0% 

CBS-1252&3: 0% 

0% – 40% 

1% 

Diverts brewing water from 

brew process 

A2.60 

 

This is a 

Safety 

Feature

 

Drip Delay 

1:30 mm:ss 

0:30 – 6:00 Min. 

 

Time that brew basket remains 

locked during final drip-out 

Drip delay remains “ON” for 

1:30 minutes if STOP  is 

pressed during brew† 

A30 

Batch Enabled 

A30  YES 

-

  

         NO   

+

 

NO-inactive 

(defaults to recipe 

A20 if activated) 

Middle and Bottom 

batches A2,A3 

Batch  

on or off 

Batches may be individually 

enabled, rewritten or 

deactivated  

A90 

Batch 

Copy

 

Copy From Batch 

A90 

A90 1 (1-6) 

 

 

A91 

Copy To Batch? 

A91 

A91.1 (1-6) 

 

 

PULSE BREW note.  FETCO CBS-1200V+ brewers are factory programmed to pulse 2 cycles per minute brew time  

Changing the brew time only will increase the pulses but will not change the volume of brew water delivered 

 

 

 

 

 

Summary of Contents for E1251IN-1B140-PM110

Page 1: ...ide and Operator Instructions CBS 1251 CBS 1252 and CBS 1253 Extractor Plus Brewing System FETCO PLUS Commercial Beverage Equipment CBS 1251 CBS 1252 1 gallon brewer with FETCO 1 Gallon L4D dispensers...

Page 2: ...5 30 minutes 4 minute brew time 1 30 minute drip delay 0 Bypass CBS 2153 2 gallon Factory default setting First batch 2 gal 6 30 minutes 5 minute brew time 1 30 minute drip delay 15 Bypass Second batc...

Page 3: ...22 2 25 5 15 9 gal 60 4 liters 3 X 3 0 kW 208 240 3 3 G 6 8 9 0 19 3 22 2 23 9 gal 90 6 liters E1252US UB250 PM110 Selectable 1 or 3 phase Sold as 3 phase 2 X 5 0 kW 208 240 1 2 G 7 6 10 0 36 6 42 2...

Page 4: ...tput Specifications All brewers have terminal block electrical utility connection 50Hz or 60Hz Configuration Codes Heater Configuration Voltage Phase Wires KW Amp Draw Brew Volume Hour E1253IN 3B330 P...

Page 5: ...r SSR E1 Ready Temp Offset F1 Firmware Ver G1 Filter Used H1 Save Changes A12 Brew Time B2 Brew at Temp C2 Basket Sensor D2 Fill Valve E2 LLC Sensitivity F2 Bootloader Ver G2 Filter Life H2 EXIT A13 P...

Page 6: ...BATCH A1 permanent BATCH A4 permanent BATCH A2 enabled by factory BATCH A5 enabled by factory BATCH A3 disabled by factory BATCH A6 disabled by factory The A menu is the most accessed menu It is for p...

Page 7: ...during brew A2 00 BATCH ENABLED YES Active Middle and Bottom batches A2 3 5 6 Batch on or off Batches may be individually enabled rewritten or deactivated A2 10 Batch Volume 1 5 gal 6 8 liters 0 51 to...

Page 8: ...emperature ft m Suggested Setting F Boiling point F Suggested Setting C Boiling point C 0 0 205 212 0 96 100 0 500 152 205 211 0 96 99 5 1000 305 200 210 1 93 98 9 2000 610 200 208 1 93 97 8 2500 762...

Page 9: ...is 10 sec Toggle OFF or ON Press To Test D3 LT left Brew Valve Test Press to test Activates valve Default is 10 sec Toggle OFF or ON Runs valve to verify flow NOTE Have container under brew basket D4...

Page 10: ...ACTUAL VOLUME X CURRENT SETTING NEW SETTING Left Brew Valve FR 0 95 0 80G to 1 09G PROGRAMMED VOLUME Right Brew Valve FR 0 95 0 80G to 1 09G Use this formula to determine the correct setting Set FR l...

Page 11: ...id not refill within expected time Water flow too slow from main Water supply flow rate is too low External to brewer Watch for short potting during brew cycle Investigate cause of low flow rate Clogg...

Page 12: ...olume through right valve CBS 1251 CBS 1252 G31 A Rt Brew Volume R G32 A Lt Bypass Cycles LT Left bypass valve operation on off Count Totalized cycles of valve operation CBS 1252 only G33 A Lt Bypass...

Page 13: ...From SAVE screen Press button 2 to toggle to the SAVE YES screen To SAVE and EXIT Press button 1 to SAVE your changes and EXIT NOTE User Settings will be erased and overwritten to factory default set...

Page 14: ...ner such as URNEX TABZ DIP IT or Squeak n Clean 2 Carefully Follow the instructions supplied with the cleaning product 3 Never use spray cleaners solvent solvent based cleaner or petroleum based polis...

Page 15: ...as possible 4 All beverage equipment must use a water filter A finishing carbon filter is preferred 5 Install the filter unit after a water shutoff valve and in a position to facilitate filter replac...

Page 16: ...he unit warranty and may lead to electric shock or burn as well as damage to unit and or its surroundings 7 If the power cord requires repair or replacement it must be performed by the manufacturer or...

Page 17: ...NDLE 1023 00180 00 BLUE PLUG BB HANDLE Stainless Steel Brew Basket Ref Part Number Description B001280B1 Complete Stainless Steel Brew basket no clips Standard B002280B1 Complete Stainless Steel Brew...

Page 18: ...r the latest versions of all information Page 18 User Guide Operator instructions P213e0 NOVEMBER 2021 Parts Diagram CBS 1251 6 Part Number1102 00471 00 ELECTRICAL COMPONENT LATTICE Drawing 1101 00572...

Page 19: ...9 00 WELDMENT FRONT COVER CBS 2250 27 1 1001 00402 00 COVER TOP CBS 2251 28 1 1001 00403 00 COVER UPPER BASE CBS 2251 29 12 1082 00017 00 SCREW TRUSS HD PHIL MACHINE 6 32 X 1 2 LG 30 1 1046 00035 00 L...

Page 20: ...n Page 20 User Guide Operator instructions P213e0 NOVEMBER 2021 Parts Diagrams CBS 1252 and CBS 1253 6 Part Number1102 00471 00 ELECTRICAL COMPONENT LATTICE Parts lists for CBS 1252 1 1 2 gallon Drawi...

Page 21: ...082 00017 00 SCREW TRUSS HD PHIL MACHINE 6 32 X 1 2 LG 30 1 1046 00035 00 LABEL WARNING TO REDUCE RISK OF ELECTRIC SHOCK OR FIRE 31 1 1402 00097 10 WIRE HARNESS CBS 1240 50 LOW AMP UNIVERSAL 32 1 1402...

Page 22: ...IN VARISTOR 9 2 1081 00042 00 STANDOFF 1 4 HEX 10 1 1107 00010 00 HEATER ASSEMBLY IMMERSION 4kW 240VAC 10 1 1107 00032 00 HEATER ASSEMBLY IMMERSION 5kW 240VAC 11 2 1024 00053 00 LEVEL AND TEMP PROBE...

Page 23: ...81 00042 00 STANDOFF 1 4 HEX 10 2 1107 00037 00 HEATER ASSEMBLY IMMERSION 2300W 240VAC 10 2 1107 00005 00 HEATER ASSEMBLY IMMERSION 3000W 240VAC 11 2 1024 00053 00 LEVEL AND TEMP PROBE GROMMET 12 1 10...

Page 24: ...VARISTOR 9 4 1081 00042 00 STANDOFF 1 4 HEX 10 2 1107 00005 00 ASSEMBLY IMMERSION HEATER 3000W 240VAC 10 2 1107 00032 00 ASSEMBLY IMMERSION HEATER 5000W 240VAC 11 2 1024 00053 00 LEVEL AND TEMP PROBE...

Page 25: ...GHT GROMMET 625 10 1 1023 00166 00 FITTING COLD WATER INLET GROMMET DESIGN 11 1 1107 00005 00 ASSEMBLY IMMERSION HEATER 3000W 240VAC 11 1 1107 00010 00 ASSEMBLY IMMERSION HEATER 4000W 240VAC 11 1 1107...

Page 26: ...SCADE SPRAY DOME CBS 2050 60 S 5 2 1057 00076 00 VALVE ASSEMBLY COMPLETE NG DELTROL interchangeable with 1057 00078 00 5 2 1057 00078 00 VALVE ASSEMBLY COMPLETE NG RPE interchangeable with 1057 00076...

Page 27: ...ions of all information Page 27 User Guide Operator instructions P213e0 NOVEMBER 2021 Wiring Diagrams SSR CBS 1251 PLUS Wiring diagram 1401 00196 10 SKU E1251US 1B230 PM110 heaters 2 X 3 0 kW SKU E125...

Page 28: ...est versions of all information Page 28 User Guide Operator instructions P213e0 NOVEMBER 2021 SSR CBS 1251 Plus Wiring Diagram 1401 00197 10 SKU E1251IN 1B140 PM110 heaters 1 X 4 0 kW SKU E1251IN 1B15...

Page 29: ...SR SSR L1 1 31 POWER L1 L2 L3 POWER L1 L3 THREE PHASE SINGLE PHASE L2 2 32 L3 3 33 L2 NOT CONNECTED L1 1 31 L2 2 33 L3 3 32 CBS 1252 V PlusWiring Diagram 1401 00197 10 SKU E1253US UB230 PM110 Heaters...

Page 30: ...t versions of all information Page 30 User Guide Operator instructions P213e0 NOVEMBER 2021 SSR SSR CBS 1252 Plus Wiring Diagram 1401 00199 10 SKU E1252IN 1B230 PM110 heaters 2 X 3 0 kW SKU E1252IN 1B...

Page 31: ...Guide Operator instructions P213e0 NOVEMBER 2021 SSR SSR SSR CBS 1252 PLUS CE Models SKU E1252IN 3B330 PM110 heaters3 X 3 0 kW 220 380 or 240 415 SKU E1252IN 3B340 PM110 heaters 3 X 4 0 kW 220 380 or...

Page 32: ...End of section notes N...

Reviews: