Fetco E1251IN-1B140-PM110 Users Manual And Operator Instructions Download Page 12

Go to fetco.com for the latest versions of all information         

Page 12

      

User Guide & Operator instructions

   

P213

e0

 NOVEMBER 2021

 

 

 

 

 

 

 

 

 

G Counters

 

Brewer Usage, Water Filter Usage, and Statistics 

ROLE: [LT]=Permanent total for lifetime of machine;  [R]=operator resettable;   [User]=Input needed from operator 

Position  Counter  Program items  Role 

Information 

Increments 

Notes 

G1-G4 are for water filter maintenance.  All beverage equipment must use filtered water and filter cartridges must be monitored for quality 

G4 

A, S, B 

Counter Reset 

[User]  NO 

/- ,Y or N  Resets all resettable counters to zero 

G5 

A, S, B 

Choose Counter 

 

Factory set to BASIC 

       Basic=

B

 

Advanced=

A

 

Statistical=

S

 

Stored brewer component activity..  

See 

column 2, Counters

, to identify where 

counters are located. 

G10-G15 Number of brews and volumes handled. Available in BASIC counter only (G5) 

G10 

Brewer Volume  

[LT] 

Dispensed volume 

Gallons/Liters 

Total of brews and hot water dispensed 

G11 

Brewer Volume  

[R] 

G12 

Lt Brews  

[LT] 

Left side brew total 

CBS-1252 

Count 

Total brews-Left side (CBS-1252 only) 

G13 

Lt Brews  

[R] 

G14 

Rt Brews  

[LT] 

Right side brew total 

CBS-1251&CBS-1252  Count 

Total brews-Right side 

CBS-1251&CBS-1252 

G15 

Rt Brews  

[R] 

G20-G55  component use cycles and volumes handled. Available in ADVANCED counter only (G5) 

G20 

Fill Cycles  

[LT]  Hot water tank refill 

cycles 

Count 

Cycles of hot water tank refill 

G21 

Fill Cycles  

[R] 

G22 

Fill Volume  

[LT]  Total volume of water 

for all brews 

Gallons/Liters 

Quantity of water for brews 

G23 

Fill Volume  

[R] 

G24 

Lt Brew Cycles  

[LT]  Left brew valve 

operation on/off 

Count 

Totalized cycles of valve operation 

(CBS-1252 only) 

G25 

Lt Brew Cycles  

[R] 

G26 

Lt Brew Volume  

[LT]  Left brew valve  

flow through volume 

Gallons/Liters 

Totalized volume through left valve 

(CBS-1252 only) 

G27 

Lt Brew Volume  

[R] 

G28 

Rt Brew Cycles  

[LT]  Right brew valve 

operation on/off 

Count 

Totalized cycles of valve operation 

CBS-1251&CBS-1252 

G29 

Rt Brew Cycles  

[R] 

G30 

Rt Brew Volume  

[LT]  Right brew valve  

flow through volume 

Gallons/Liters 

Totalized volume through right valve 

CBS-1251&CBS-1252 

G31 

Rt Brew Volume  

[R] 

G32 

Lt Bypass Cycles  

[LT]  Left bypass valve 

operation on/off 

Count 

Totalized cycles of valve operation 

(CBS-1252 only) 

G33 

Lt Bypass Cycles  

[R] 

G34 

Lt Bypass Volume  

[LT]  Left bypass valve  

flow through volume 

Gallons/Liters 

Totalized volume through left valve 

(CBS-1252 only) 

G35 

Lt Bypass Volume  

[R] 

G36 

Rt Bypass Cycles  

[LT]  Count 

Count 

Totalized cycles of valve operation 

CBS-1251&CBS-1252 

G37 

Rt Bypass Cycles  

[R] 

G38 

Rt Bypass Volume  

[LT]  Right bypass valve flow 

through volume 

Gallons/Liters 

Totalized volume through right valve 

CBS-1251&CBS-1252 

G39 

Rt Bypass Volume  

[R] 

G48 

Lt BBL Cycles  

[LT]  Left brew basket lock  

flow through volume 

Count 

Totalized cycles of brew basket lock 

operation  (CBS-1252 only) 

G49 

Lt BBL Cycles  

[R] 

G50 

Rt BBL Cycles  

[LT]  Right brew basket lock 

operation on/off 

Count 

Totalized cycles of brew basket lock 

operation  CBS-1251&CBS-1252 

G51 

Rt BBL Cycles  

[R] 

G52 

Heater Cycles  

[LT]  ON/OFF switching for 

heating elements 

Count 

Totalized cycles of heater switching 

G53 

Heater Cycles  

[R] 

G54 

Heater On Time  

[LT]  Total ON time for 

heating element 

Hour 

Totalized heater ON time in hours 

G55 

Heater On Time  

[R] 

G80-G91 See illustration below for batch button positions Available in STATISTICAL counter only (G5) 

G80 

Batch 10 Cycles  

[LT]  Menu button selection 

and activation count 

Count

 

Total brews-left side top button 

(CBS-1252 only) 

G81 

Batch 10 Cycles  

[R] 

G82 

Batch 20 Cycles  

[LT] 

Menu button selection 

and activation count

 

Count

 

Total brews-left side middle button 

(CBS-1252 only) 

G83 

Batch 20 Cycles  

[R] 

G84 

Batch 30 Cycles  

[LT] 

Menu button selection 

and activation count

 

Count

 

Total brews-left side bottom button 

(CBS-1252 only) 

G85 

Batch 30 Cycles  

[R] 

G86 

Batch 40 Cycles  

[LT] 

Menu button selection 

and activation count

 

Count

 

Total brews-right side top button 

CBS-1251&CBS-1252 

G87 

Batch 40 Cycles  

[R] 

G88 

Batch 50 Cycles  

[LT] 

Menu button selection 

and activation count

 

Count

 

Total brews-right side middle button 

CBS-1251&CBS-1252 

G89 

Batch 50 Cycles  

[R] 

G90 

Batch 60 Cycles  

[LT] 

Menu button selection 

and activation count

 

Count

 

Total brews-right side bottom button 

CBS-1251&CBS-1252 

G91 

Batch 60 Cycles  

[R] 

Summary of Contents for E1251IN-1B140-PM110

Page 1: ...ide and Operator Instructions CBS 1251 CBS 1252 and CBS 1253 Extractor Plus Brewing System FETCO PLUS Commercial Beverage Equipment CBS 1251 CBS 1252 1 gallon brewer with FETCO 1 Gallon L4D dispensers...

Page 2: ...5 30 minutes 4 minute brew time 1 30 minute drip delay 0 Bypass CBS 2153 2 gallon Factory default setting First batch 2 gal 6 30 minutes 5 minute brew time 1 30 minute drip delay 15 Bypass Second batc...

Page 3: ...22 2 25 5 15 9 gal 60 4 liters 3 X 3 0 kW 208 240 3 3 G 6 8 9 0 19 3 22 2 23 9 gal 90 6 liters E1252US UB250 PM110 Selectable 1 or 3 phase Sold as 3 phase 2 X 5 0 kW 208 240 1 2 G 7 6 10 0 36 6 42 2...

Page 4: ...tput Specifications All brewers have terminal block electrical utility connection 50Hz or 60Hz Configuration Codes Heater Configuration Voltage Phase Wires KW Amp Draw Brew Volume Hour E1253IN 3B330 P...

Page 5: ...r SSR E1 Ready Temp Offset F1 Firmware Ver G1 Filter Used H1 Save Changes A12 Brew Time B2 Brew at Temp C2 Basket Sensor D2 Fill Valve E2 LLC Sensitivity F2 Bootloader Ver G2 Filter Life H2 EXIT A13 P...

Page 6: ...BATCH A1 permanent BATCH A4 permanent BATCH A2 enabled by factory BATCH A5 enabled by factory BATCH A3 disabled by factory BATCH A6 disabled by factory The A menu is the most accessed menu It is for p...

Page 7: ...during brew A2 00 BATCH ENABLED YES Active Middle and Bottom batches A2 3 5 6 Batch on or off Batches may be individually enabled rewritten or deactivated A2 10 Batch Volume 1 5 gal 6 8 liters 0 51 to...

Page 8: ...emperature ft m Suggested Setting F Boiling point F Suggested Setting C Boiling point C 0 0 205 212 0 96 100 0 500 152 205 211 0 96 99 5 1000 305 200 210 1 93 98 9 2000 610 200 208 1 93 97 8 2500 762...

Page 9: ...is 10 sec Toggle OFF or ON Press To Test D3 LT left Brew Valve Test Press to test Activates valve Default is 10 sec Toggle OFF or ON Runs valve to verify flow NOTE Have container under brew basket D4...

Page 10: ...ACTUAL VOLUME X CURRENT SETTING NEW SETTING Left Brew Valve FR 0 95 0 80G to 1 09G PROGRAMMED VOLUME Right Brew Valve FR 0 95 0 80G to 1 09G Use this formula to determine the correct setting Set FR l...

Page 11: ...id not refill within expected time Water flow too slow from main Water supply flow rate is too low External to brewer Watch for short potting during brew cycle Investigate cause of low flow rate Clogg...

Page 12: ...olume through right valve CBS 1251 CBS 1252 G31 A Rt Brew Volume R G32 A Lt Bypass Cycles LT Left bypass valve operation on off Count Totalized cycles of valve operation CBS 1252 only G33 A Lt Bypass...

Page 13: ...From SAVE screen Press button 2 to toggle to the SAVE YES screen To SAVE and EXIT Press button 1 to SAVE your changes and EXIT NOTE User Settings will be erased and overwritten to factory default set...

Page 14: ...ner such as URNEX TABZ DIP IT or Squeak n Clean 2 Carefully Follow the instructions supplied with the cleaning product 3 Never use spray cleaners solvent solvent based cleaner or petroleum based polis...

Page 15: ...as possible 4 All beverage equipment must use a water filter A finishing carbon filter is preferred 5 Install the filter unit after a water shutoff valve and in a position to facilitate filter replac...

Page 16: ...he unit warranty and may lead to electric shock or burn as well as damage to unit and or its surroundings 7 If the power cord requires repair or replacement it must be performed by the manufacturer or...

Page 17: ...NDLE 1023 00180 00 BLUE PLUG BB HANDLE Stainless Steel Brew Basket Ref Part Number Description B001280B1 Complete Stainless Steel Brew basket no clips Standard B002280B1 Complete Stainless Steel Brew...

Page 18: ...r the latest versions of all information Page 18 User Guide Operator instructions P213e0 NOVEMBER 2021 Parts Diagram CBS 1251 6 Part Number1102 00471 00 ELECTRICAL COMPONENT LATTICE Drawing 1101 00572...

Page 19: ...9 00 WELDMENT FRONT COVER CBS 2250 27 1 1001 00402 00 COVER TOP CBS 2251 28 1 1001 00403 00 COVER UPPER BASE CBS 2251 29 12 1082 00017 00 SCREW TRUSS HD PHIL MACHINE 6 32 X 1 2 LG 30 1 1046 00035 00 L...

Page 20: ...n Page 20 User Guide Operator instructions P213e0 NOVEMBER 2021 Parts Diagrams CBS 1252 and CBS 1253 6 Part Number1102 00471 00 ELECTRICAL COMPONENT LATTICE Parts lists for CBS 1252 1 1 2 gallon Drawi...

Page 21: ...082 00017 00 SCREW TRUSS HD PHIL MACHINE 6 32 X 1 2 LG 30 1 1046 00035 00 LABEL WARNING TO REDUCE RISK OF ELECTRIC SHOCK OR FIRE 31 1 1402 00097 10 WIRE HARNESS CBS 1240 50 LOW AMP UNIVERSAL 32 1 1402...

Page 22: ...IN VARISTOR 9 2 1081 00042 00 STANDOFF 1 4 HEX 10 1 1107 00010 00 HEATER ASSEMBLY IMMERSION 4kW 240VAC 10 1 1107 00032 00 HEATER ASSEMBLY IMMERSION 5kW 240VAC 11 2 1024 00053 00 LEVEL AND TEMP PROBE...

Page 23: ...81 00042 00 STANDOFF 1 4 HEX 10 2 1107 00037 00 HEATER ASSEMBLY IMMERSION 2300W 240VAC 10 2 1107 00005 00 HEATER ASSEMBLY IMMERSION 3000W 240VAC 11 2 1024 00053 00 LEVEL AND TEMP PROBE GROMMET 12 1 10...

Page 24: ...VARISTOR 9 4 1081 00042 00 STANDOFF 1 4 HEX 10 2 1107 00005 00 ASSEMBLY IMMERSION HEATER 3000W 240VAC 10 2 1107 00032 00 ASSEMBLY IMMERSION HEATER 5000W 240VAC 11 2 1024 00053 00 LEVEL AND TEMP PROBE...

Page 25: ...GHT GROMMET 625 10 1 1023 00166 00 FITTING COLD WATER INLET GROMMET DESIGN 11 1 1107 00005 00 ASSEMBLY IMMERSION HEATER 3000W 240VAC 11 1 1107 00010 00 ASSEMBLY IMMERSION HEATER 4000W 240VAC 11 1 1107...

Page 26: ...SCADE SPRAY DOME CBS 2050 60 S 5 2 1057 00076 00 VALVE ASSEMBLY COMPLETE NG DELTROL interchangeable with 1057 00078 00 5 2 1057 00078 00 VALVE ASSEMBLY COMPLETE NG RPE interchangeable with 1057 00076...

Page 27: ...ions of all information Page 27 User Guide Operator instructions P213e0 NOVEMBER 2021 Wiring Diagrams SSR CBS 1251 PLUS Wiring diagram 1401 00196 10 SKU E1251US 1B230 PM110 heaters 2 X 3 0 kW SKU E125...

Page 28: ...est versions of all information Page 28 User Guide Operator instructions P213e0 NOVEMBER 2021 SSR CBS 1251 Plus Wiring Diagram 1401 00197 10 SKU E1251IN 1B140 PM110 heaters 1 X 4 0 kW SKU E1251IN 1B15...

Page 29: ...SR SSR L1 1 31 POWER L1 L2 L3 POWER L1 L3 THREE PHASE SINGLE PHASE L2 2 32 L3 3 33 L2 NOT CONNECTED L1 1 31 L2 2 33 L3 3 32 CBS 1252 V PlusWiring Diagram 1401 00197 10 SKU E1253US UB230 PM110 Heaters...

Page 30: ...t versions of all information Page 30 User Guide Operator instructions P213e0 NOVEMBER 2021 SSR SSR CBS 1252 Plus Wiring Diagram 1401 00199 10 SKU E1252IN 1B230 PM110 heaters 2 X 3 0 kW SKU E1252IN 1B...

Page 31: ...Guide Operator instructions P213e0 NOVEMBER 2021 SSR SSR SSR CBS 1252 PLUS CE Models SKU E1252IN 3B330 PM110 heaters3 X 3 0 kW 220 380 or 240 415 SKU E1252IN 3B340 PM110 heaters 3 X 4 0 kW 220 380 or...

Page 32: ...End of section notes N...

Reviews: