background image

Go to fetco.com for the latest versions of all information        

 

Page 9                 

P183   March 2019

 

 

 

 

Timing System: 

 

The timing system consist of the timer and the dispense latch assembly. 

 

When the brew handle is rotated from the stop to the brew position, it pushes the plunger in the latch coil and 

closes the micro switch, and the timer starts the timed cycle. It also starts the hot water flowing. 

 

The timer energizes the dispense latch coil, which acts as a magnet, to hold the brew handle in the brew position.  

It also lights the brew light.  The coil remains energized throughout the brew cycle timed sequence. 

 

When the timer finishes its cycle, it removes voltage from the latch coil. The latch coil then releases the brew 

handle, a spring returns it to the stop position, and the flow of water stops.  This return opens the micro switch, 

stopping voltage from going to the timer.  The brew light and the timer are disabled, and wait for the brew handle to 

engage the next brew cycle. 

 

Dispense System: 

 

The dispense system is completely mechanical. It is one of the areas that makes FETCO's brewer truly unique. 

(See the illustration in this section.) 

 

When you rotate the brew lever down to brew, the end of the dispense tube is submerged in the hot water tank.  It 

is held in the brew position by the magnetic action of the dispense latch coil.  

 

The brew water travels down the dispense tube to the sprayhead assembly. The flow disc above the spray cutter 

controls the rate of flow over the coffee. The standard hole in the flow disc is .240”, except for the CBS-51H10, 

which is .219”.  Other flow discs are available for special situations like high levels of by-pass. 

 

The sprayhead can be assembled incorrectly during cleaning.  Refer to the cleaning label on the brewer for proper 

assembly.  The flow disc has the flange down, flat side up.  The six triangle spray cutter has the flange up. The 

eight hole spray cutter used in place of the triangle cutter goes bumps down. 

 

A bypass valve and tube are connected to the sprayhead. This valve directs brew water around the outside edge of 

the filter paper. The by-pass valve is shipped in the closed position from the factory.  Each time the valve is 

adjusted, the brew volume is affected. Adjustment of the by-pass valve is for flavor only. 

When the timer circuit releases the brew latch, the dispense tube pops back above the hot water level. The 

remaining brew water drains from the dispense system leaving it free of standing water.  Steam escaping from the 

brew tank through this tube inhibits the formation of lime in the brew system. 

 

The dispense system is clean & semi dry for all but the brief time required for the brew cycle.  This eliminates any 

chance of lime build-up affecting the brew cycle. 

 

It is very easy to dislodge the dispense tube seals while servicing the dispense system. If you see it leaking 

profusely, remove the nut and dispense tube. Reset the seal fully into the recess and carefully insert the dispense 

tube. Then secure the locknut before you back the tube into position.  (See detailed instructions on page 10.) 

Summary of Contents for CBS-5000H Series

Page 1: ...ingle1 Gal CBS 51H15 Right Dual 2 Gal CBS 52H20 Contact Information FETCO Food Equipment Technologies Company 600 Rose Road Lake Zurich IL 60047 1560 USA 2008 2019 Food Equipment Technologies Company...

Page 2: ...lf batch brewing capability Fully automatic with electronic temperature control Iced tea brewing capability Two level tank drain system Total serviceability from the front Can be added at any time Spe...

Page 3: ...ph 3 ground 6 1 25 8 9 9 22 0 120 208 1 ph 3 ground 6 1 29 6 9 9 22 0 C52026 2 X 4000 watt 120 220 1 ph 3 ground 6 8 31 3 11 5 22 0 120 240 1 ph 3 ground 8 1 34 1 13 2 22 0 120 208 3 ph 4 ground 6 9...

Page 4: ...Go to fetco com for the latest versions of all information Page 4 P183 March 2019 Dimensions Utility Connections CBS 51H15 CBS 52H15 CBS 52H20...

Page 5: ...ing Verify that the brewer will fit in the space intended for it and that the counter or table will support the total weight of the brewer and dispensers when filled 2 The brewer s legs are shipped in...

Page 6: ...tubes 2 Turn on the incoming power 3 Turn on the brewer s main power switch 4 Within 6 seconds the hot water tank will begin filling until the probe at the top of the tank senses the water 5 The contr...

Page 7: ...ion This was done to help draw attention to the basket so the operator will notice any residual hot water or coffee Place a paper filter in each basket to be used Pour into the paper filter the approp...

Page 8: ...never the power switch is turned on voltage will not be supplied to the thermostat until the tank fills and water touches the water level probe During operation when water is dispensed and the water l...

Page 9: ...cutter controls the rate of flow over the coffee The standard hole in the flow disc is 240 except for the CBS 51H10 which is 219 Other flow discs are available for special situations like high levels...

Page 10: ...ISPENSE TUBE SHAFT DISPENSE TUBE To remove the dispense tube 1 Unscrew seal locknut and release the drive screw from dispense tube shaft 2 Turn the dispense tube slightly back and forth while pushing...

Page 11: ...will flash indicating that the display is showing the set point not the actual temperature The dots below the numbers indicate the temp range 0 dots less than 100 F 1 dot between 100 and 200 F 2 dots...

Page 12: ...is energized Bypass Adjustment The purpose of the bypass valve is to allow a portion of the brewing water to flow between the brew basket and the wire insert directly into the server without coming in...

Page 13: ...NUT SEAL 7 16 DIA KEEPER 17 2 1031 00033 00 LOCKNUT 3 8 18 NPT THREAD 18 1 1031 00022 00 FITTING ELBOW 3 8 TUBE OD X 3 8 NPT 19 1 1023 00003 00 LOCKNUT MODIFIED THREAD 1 4 18 NPT 20 1 1083 00006 00 WA...

Page 14: ...Go to fetco com for the latest versions of all information Page 14 P183 March 2019 Figure 2 CBS 51H15 Main Assembly Drawing No 1101 00268 00 CBS 51 H...

Page 15: ...AMP READY INDICATOR GREEN 220VAC EXPORT ONLY 26 1 1045 00022 00 OVERLAY CONTROL PANEL CBS 51H 27 1 1058 00011 00 LAMP BREW INDICATOR CLEAR 110VAC 27 1 58004 LAMP BREW INDICATOR CLEAR 220VAC EXPORT ONL...

Page 16: ...Go to fetco com for the latest versions of all information Page 16 P183 March 2019 Figure 3 CBS 52H15 CBS 52H20 Main Assembly Drawing No 1101 00262 00 CBS 52H...

Page 17: ...SPRAY CUTTER 8 1 075 CENTER 29 2 1012 00004 00 LOCKNUT SPRAY CUTTER 30 2 25001 TUBESILICONE 1 2 x 1 4 ID x 2 7 8 LG 31 2 1112 00041 00 DISPENSE TUBE WELDMENT CBS 50 S 32 1 102010 BREW HANDLE START STO...

Page 18: ...00024 00 FITTING COMP MALE CONN 3 8 TUBE X 3 8 17 1 1031 00020 00 LOCKNUT 1 8 STRAIGHT PIPE THREAD 18 1 1083 00014 00 WASHER 812 OD X 0 412 ID FLAT 19 1 1031 00032 00 FITTING BARB ELBOW 90 1 4 HOSE ID...

Page 19: ...BREW BASKET HANDLE BLACK includes magnet 3 1 1082 00040 00 HANDLE SCREW 4 1 1009 00005 00 WIRE INSERT 16 X 6 5 1 1046 00025 00 WARNING LABEL NOT SHOWN F001 PAPER FILTERS 15 X 5 5 500 PER CASE NOT SHO...

Page 20: ...evels are erratic Water pressure or flow rate is too low or fluctuates too much to support a full brew problem is worse in simultaneous brews Make sure brewer has a dedicated water line Ensure that th...

Page 21: ...isconnect the outlet side to see if it leaks water to the tank Coffee tastes too strong Incorrect dosage Measure and confirm the correct amount of coffee required Short brew levels See Short brew leve...

Page 22: ...End of section notes N...

Reviews: