Fetco CBS-2041e User Manual Download Page 7

 

Final Setup 

1.  Turn on the incoming water supply line and inspect both inside 

and outside of the brewer for leaks in all fittings and tubes 

2.  Turn on the incoming power. 
3.  Press the brewer’s main power switch, which is hidden behind the 

front leg of the brewer. The control panel on/off switch will begin 
flashing.  Press this switch.  

4.  Within 6 seconds, the hot water tank will begin filling until the 

water is sensed by the probe at the top of the tank. The display will 
read “FILL”. The heaters will be disabled by the control board until 
the tank is full. 

5.  While the water is heating, the display will read “LO”. Once the 

temperature has reached 175°F, the actual water temperature will 
also be displayed. After the water has reached the set 
temperature, the display will be blank. There is no “ready” light. 

6.  Review the Operating Instructions. Brew one full batch (water 

only) on each side to confirm proper fill levels. The brewer is 
factory set with water only (no coffee) to dispense the correct 
amount of water.  If the actual volume is slightly different from the 
programmed volume, fine tuning the brewer may be necessary. 
See #60 – 61 in the Advanced Settings & Diagnostics section. 

7.  Re-attach the covers after one final inspection for leaks.  Look 

closely in the top of the brewer at the dispense fittings during this 
inspection. 

 

Operator Training 

Review the operating procedures with whoever will be using the 
brewer.  Pay particular attention to the following areas: 
 

1.  Always pre-heat the dispensers before the first use of each day by 

filling them half way with hot water, and letting them stand for at 
least 15 minutes. 

2.  Don't remove the brew basket until it has stopped dripping.  
3.  Make sure the dispenser is empty before brewing into it. 
4.  Show how to attach covers, close, and or secure the thermal 

dispensers for transporting. 

5.  Show the location and operation of the water shut off valve as well 

as the circuit breaker for the brewer. 

6.  Steam from the tank will form condensation in the vent tubes.  This 

condensation will drip into and then out of the brew baskets.  1/4 
cup discharging overnight is possible.  Place an appropriate 
container under each brew basket when not in use. 

7.  We recommend leaving the power to the brewer on overnight. The 

water tank is well insulated and will use very little electricity to 
keep the tank hot.  Leaving the brewer in the on position will also 
avoid delays at the beginning of shifts for the brewer to reach 
operating temperature. 

 

 

 

CONTROL PANEL 

ON/OFF SWITCH 

OFF = NO POWER 

FLASHING = MAIN POWER ON 

LIT = CONTROL PANEL ON

 

BREW 

SWITCHES

 

MAIN POWER 

SWITCH

 

LOCATED UNDER 

FRONT PANEL, 

DIRECTLY BEHIND 

FRONT LEG. 

 

CIRCUIT BREAKER

 

LOCATED BEHIND 

MAIN POWER 

SWITCH. 

 

 
 
 

 

 
 

Summary of Contents for CBS-2041e

Page 1: ...ation and Brewing Efficiency 3 Dimensions Utility Connections 4 Installation 5 Operating Instructions 8 Programming 9 Batch Settings 9 Temperature Settings 10 Advanced Settings and Diagnostics 10 Relay Test 11 Error Codes 12 Service 13 Cleaning Maintenance 13 Wiring Diagrams 14 Parts 16 NOTICE TO INSTALLER This book contains important programming instructions that will be needed by the customer Pl...

Page 2: ...the brew cycle and the unlocking of the brew basket Using these variables the software calculates how much water to use for prewetting bypass and brewing The total brew time is divided into several 30 second cycles Within these cycles the software calculates how long to spray water over the coffee grounds and how long to pause before the next cycle begins The bypass valve opens at the beginning of...

Page 3: ...9 11 0 to 120 VAC or 120 220 4 1 18 1 9 9 11 0 120 208 240 VAC 120 240 4 7 19 7 11 0 11 0 CBS 2042 1 0 gallon per batch Electrical Heater Voltage Maximum Batches per Hour max 22 Config Code Configuration AC Phase Wires KW Amp draw Cold Water Hot Water E42016 2 X 3 KW 120 208 single 3 ground 4 6 22 4 11 5 22 0 120 220 5 1 23 7 12 9 22 0 120 240 6 1 25 8 15 4 22 0 Based on standard factory settings ...

Page 4: ...4 Dimensions Utility Connections CBS 2041 CBS 2042 ...

Page 5: ...ructions Brewer Setup 1 Review the Dimensions for the unit you are installing Verify that the brewer will fit in the space intended for it and that the counter or table will support the total weight of the brewer and dispensers when filled 2 The brewer s legs are shipped inside the brew baskets Remove the brew basket s and the coffee dispenser s Place the brewer on its back and screw in the legs 3...

Page 6: ...e power terminal block Use only 10 gauge copper wire for grounding 6 Electrical connections must be secured in place within the unit to meet national and local standards 7 Finally connect the incoming power wires to the terminal block as shown in accordance with applicable codes CBS 2041 This model can be connected to 120 VAC or 120 208 240 VAC Factory Configuration 120 VAC 3 wires L1 L2 N GROUND ...

Page 7: ...losely in the top of the brewer at the dispense fittings during this inspection Operator Training Review the operating procedures with whoever will be using the brewer Pay particular attention to the following areas 1 Always pre heat the dispensers before the first use of each day by filling them half way with hot water and letting them stand for at least 15 minutes 2 Don t remove the brew basket ...

Page 8: ... STOP BREW CYCLE BREW LARGE PORTION BREW SMALL PORTION MAIN POWER INDICATOR LAMP PRESS AND HOLD FOR 1 SECOND TO START PRESS AND HOLD FOR 1 SECOND TO START Y Z X MAIN POWER SWITCH LOCATED UNDER FRONT PANEL DIRECTLY BEHIND FRONT LEG Brewing 1 Turn the main power switch and control panel switch on 2 Prepare a brew basket with the correct size filter and appropriate amount of coffee 3 Slide the brew b...

Page 9: ...xt page MAIN POWER SWITCH IS BEHIND FRONT LEG DISPLAY ADVANCE TO NEXT PARAMETER SCROLL UP SCROLL DOWN SAVE CHANGES AND EXIT Important After programming you must press the HOT WATER button to save the settings and exit programming mode or changes will be lost You may exit programming at any time Batch Parameters X Batch Number 1 4 Parameter Name Range Increment Default Setting Comment X 0 Batch Ena...

Page 10: ... water is touching probe 0 Tank is less than full 1 Tank is full 51 Water Resistance Water resistance ohms as read by probe 52 Brew Basket Sensor State left right 0 1 To test slide the brew basket in and out Display should toggle between 0 and 1 0 Brew basket in 1 Brew Basket out 53 Power Relay State 0 1 Checks power relay on control board To test press Control Panel Power Switch Display should to...

Page 11: ...d S1 S2 S3 etc The hot water switch must be pressed last as this will exit the test 65 Relay Test 0 1 0 0 Skip relay test Loop back to 50 1 Relay test active Go to 90 Press to save the settings and exit Diagnostic mode Press again to exit Programming mode and return to Operating mode Relay Test Tests the individual relays which control various components Use either batch button to actuate the rela...

Page 12: ...o low Watch for short potting during brew cycle Investigate cause of low flow rate Clogged water filter etc Press the control panel power switch Press the control panel power switch 101 Error on refill Tank did not refill within 2 minutes Water supply flow rate is too low Watch for short potting during brew cycle Investigate cause of low flow rate Clogged water filter etc Error message is cleared ...

Page 13: ... off and on Service Utilize only qualified beverage equipment service technicians for service A Service Company Directory may be found on our web site http www fetco com Companies listed as Extractor Authorized stock parts for these models When changing the control board check the software version on the chip Example V2 11 If the chip on the replacement board has an older software version than the...

Page 14: ...14 Wiring Diagrams CBS 2041 ...

Page 15: ...15 CBS 2042 ...

Page 16: ...1 CBS 2042 ITEM QTY PART NO DESCRIPTION 1 4 82112 8 X 3 4 PAN HD PHIL T S 18 8 S S SCREW 2 1 57047 COIL ASSY REPAIR KIT DSV 11 120 VAC 2 1 57071 COIL ASSY REPAIR KIT DSV 11 240 VAC EXPORT VERSION ONLY 3 1 57073 VALVE REBUILD KIT DSV11 4 1 102082 SPRAY HOUSING ASSY 5 1 24054 O RING 4 237 I D 156 6 1 102081 SPRAY PLATE ASSY 4 7 8 DIA ...

Page 17: ...SERT 13 X 5 2 1 23117 BREW BASKET HANDLE BLACK 3 1 46011 WARNING LABEL 5 1 82096 HANDLE SCREW 8 1 57082 MAGNET NOT SHOWN F002 PAPER FILTERS 13 X 5 500 PER CASE COLOR BREW BASKET HANDLES PART DESCRIPTION 23106 BREW BASKET HANDLE GREEN 23107 BREW BASKET HANDLE ORANGE 23148 BREW BASKET HANDLE RED ...

Page 18: ......

Reviews: