VPPM−...−DE/E N
Festo VPPM−... 0810b English
40
S
Select an appropriate parameter set:
Recommended parameter sets
Tube
length
1)
Open
system
Output volume
length
1)
system
0 ... 100 ml
100 ... 1000 ml
> 1000 ml
0 m
3
3
2
1
1 m
3
3
2
2
3 m
3
3
3
2
5 m
3
3
3
2
1)
For a tube diameter of 6 mm or 8 mm
Fig.20
6
Operation
Please note
S
When switching off the VPPM−..., make sure that first the supply pressure,
then the setpoint voltage and finally the supply voltage are switched off.
7
Care and maintenance
Cleaning:
S
Switch off the following sources of energy before cleaning the exterior of the
unit:
operating voltage
compressed air.
S
If the VPPM−... is dirty, clean the exterior with a soft cloth.
The approved cleaning agent is a mild soap water solution (max. +50 °C) or all
media that are non−abrasive.