Type

Circuit  diagram 

1)

SRAPMCA1...

1)

For  pin  allocation,  see  Fig.14

Fig.13:

Pin

Allocation

Connection

1

Plus  (+) 

1)

2

Minus  () 

1)

9

3

(+)  Out  4  ...  20  mA

(sensor  signal  +)

9

4

()  Out  4  ...  20  mA

(sensor  signal  )

5

External  Teach 

2)

(+24  V  DC)

6

MV_IN  (+) 

3)  4)

7

MV_IN  ()

  3)  4)

1

8

MV_OUT  () 

3)  5)

1

9

MV_OUT  (+) 

3)  5)

1)

For  the  permissible  operating  voltage  range,  see  section  13,  Technical  data

2)

Input  for  an  external  teach  signal,  as  an  alternative  to  the  teach  button.  For  the  current  position  to  be
adopted,  the  teach  signal  (+24  V)  must  be  present  for  min.  500  ms    as  when  pressing  the  teach  button.

3)

Can  only  be  used  with  variants  with  valve  connection  SRAP−...−...−...−2..

4)

For  optional  use  to  relay  the  control  signal  for  the  solenoid  valve  (MV)    infeed

5)

For  optional  use  to  relay  the  control  signal  for  the  solenoid  valve  (MV)    forward  relay

Fig.14

4. Connect  the  earth  connection  (

è

  Fig.1 

aJ

  )  with  low  impedance  (short  cable

with  large  cross−sectional  area)  to  the  earth  potential.

5. Carefully  plug  the  terminal  strip  onto  the  pin  strip.  Make  sure  that  release  levers

engage  properly.

6. Tighten  the  union  nut  on  the  cable  connector.  This  ensures  the  right  tensile  load

capacity  and  IP  protection  class.

8

Commissioning

Warning

· Keep  hands  away  from  moving  parts  (see  section  6).

During  commissioning  you  define  the  two  end  positions  of  the  actuator  or  process
valve  corresponding  to  the  end  points  of  the  desired  measuring  range.  In  order  to
do  this  proceed  as  follows:
1. Switch  on  the  operating  voltage.  The  green  LED  lights  up  (power  supply  indica

tor 

è

  Fig.1 

aB

  ).

2. Move  the  quarter−turn  actuator  into  the  position  which  is  to  be  adopted  as  the

minimum  teach  point  (teach  Min.    teach  point  for  4mA  signal).

3. Hold  down  the  teach  button  for  at  least  about  0.5  sec  or  supply  a  corresponding

external  teach  signal  (see  Fig.14,  pin  5).  The  current  position  will  then  be
adopted  as  the  lower  teach  point,  which  is  signalled  by  the  yellow  LED  flashing.
The  new  teach  point  is  effective  immediately.  However  it  is  initially  saved  to  a
volatile  buffer  memory  which  is  cleared  if  there  is  a  voltage  drop.

4. Move  the  quarter−turn  actuator  into  the  position  which  is  to  be  adopted  as  the

maximum  teach  point  (teach  Max.    teach  point  for  20mA  signal).

5. Hold  down  the  teach  button  again  for  at  least  about  0.5  sec  or  supply  a  corre

sponding  external  teach  signal  (see  Fig.14,  pin  5).  Both  teach  points  are  then
adopted  permanently  as  the  new  end  points  of  the  measuring  range.  This  is
signalled  by  the  yellow  LED  (

è

  Fig.1 

9

  )  lighting  up  for  3seconds.  The  L ED  then

goes  out.  That  completes  the  teaching  procedure.

6. Now,  check  the  signalling  response  of  the  sensor  box  in  a  test  run.  If  the  end

points  have  been  taught  correctly,  the  sensor  box  will  return  a  corresponding
signal  curve  (examples 

è

  Fig.4  and  Fig.5).  If  an  error  was  made,  repeat 

points  2.  to  6.

7. When  commissioning  is  finished,  mount  the  cover  on  the  sensor  box    torque

max.  5  Nm.

9

Operation

· Compare  the  maximum  values  specified  in  these  operating  instructions  with

your  actual  application  (e.g.  pressures,  forces,  torques,  masses,  speeds,  tem
peratures).  The  product  can  only  be  used  in  accordance  with  the  relevant  safety
guidelines  if  the  maximum  load  limits  are  observed.

10

Service  and  maintenance

If  used  as  designated  in  the  operating  instructions,  the  device  will  be  free  of  main
tenance.
· Clean  the  outside  of  the  product  with  a  soft  cloth.  The  permitted  cleaning  agent

is  soap  suds.

11

Removal  and  repairs

Make  sure  that  the  following  energy  sources  are  switched  off:
 Electrical  power  supply
 Compressed  air  supply
· Remove  the  sensor  box  in  the  reverse  order  of  installation

(

è

  section  7.1).

For  information  about  spare  parts  and  auxiliary  means 

è

  www.festo.com/spare

parts.

12

Eliminating  malfunctions

Malfunction

Possible  cause

Remedy

Incorrect  or  unex
pected  signal  at  the
analogue  output

Operating  voltage  below  the  per
mitted  range

Adjust  the  operating  voltage  to
within  the  permitted  tolerance
range

analogue  output

Short  circuit/overload  at  relevant
output

Eliminate  short  circuit/overload

Broken  wire

Replace  cable

End  points  of  the  measuring  range
incorrectly  defined

Define  the  end  points  again  using
the  teaching  procedure

Noisy  or  slow  measuring  signal
due  to  incorrect  filter  setting  in
the  PLC/IPC

Correct  the  filter  setting  in  PLC/IPC

Fig.15

13

Technical  data

SRAP−...−...

Based  on  standard

VDI/VDE  3845  (NAMUR)

Mounting  position

Any

Protection  against  short  circuit

Yes

Measured  variable

Rotation  angle

Measuring  principle

Magnetic  Hall

Reverse  polarity  protection

All  electrical  terminals

Setting  range,  angle  sensing

[°]

0  ...  270

Sensing  range  tolerance  at  the  end  posi
tions

[°]

Min.  5/max.  +5

Operating  principle

Non−contacting  semiconductor  output

Analogue  output

[mA]

4  ...  20 

1)

Operating  voltage  range  DC

[V  DC]

15  ...  30

Overload  protection

Yes

Idle  current

[mA]

<  40

Max.  load  resistance  at  current  output

[]

300  (up  to  500    in  case  of  overload)

Linearity

[°]

±5

Hysteresis

[°]

±2

Repetition  accuracy  of  analogue  value

[°]

±1

Temperature  coefficient

[°/K]

<  0.15

Position  hysteresis  (buffer  on  the  teach
points)

[°]

7.2

Interference  immunity

See  declaration  of  conformity 

è

Interference  emission

y

è

 

www.festo.com

CE  mark  (see  declaration  of  conformity 

è

 

www.festo.com)

In  accordance  with  EU  EMC  Directive 

2)

Continuous  shock  resistance  to  DIN/IEC  68,  part  2−82

Shock  resistance  to  DIN/IEC  68,  part  2−27

Vibration  resistance  to  DIN/IEC  68,  part  2−6

 When  directly  mounted  on  DFPB−...

Severity  level  2

 When  mounted  with  mounting  bracket

Severity  level  1

Protection  class

IP  65

Ambient  temperature

[°C]

20  ...  +80

Surge  capacity

[kV]

0.8

Insulation  voltage

[V]

50

Degree  of  contamination

3

Materials  information 

3)

 Housing,  shaft

Wrought  aluminium  alloy

 Cover  of  position  indicator

Polycarbonate

 Seal

Nitrile  rubber,  fluoro  elastomer

 Mounting  screws,  toothed  disc,  retaining

washer

Stainless  steel  (A2−70)

 Sensor  system,  position  indicator 

(internal)

Polyacetate

1)

At  positions  outside 

the  defined  measuring  range  (out  of  range):  2  mA

2)

In  residential  areas,  measures  for  radio  interference  suppression  may  be  necessary.

3)

For  information  on  the  resistance  of  materials  to  aggressive  media 

è

 

www.festo.com.