3. Installation
3−7
Festo P.BE−CPASC−EN en 0412b
Pilot control variant
Pilot connection 12/14 on the base block
Operation with external pilot air
Marked open thread connector 12/14
Operation with internal pilot air
Non−marked closed connection 12/14
Tab.3/1:
Recognition features of the pilot variants
Internal auxiliary pilot air
If the operating pressure lies between 3 ... 8 bar, you can op
erate the pilot control of the valve solenoid coils with inter
nally branched pilot air. In this case the pilot air is branched
from supply channel 1 in the base block.
Please note
·
Internal pilot air for all valve solenoid coils is branched
centrally from supply channel 1. This also applies when
the CPA−SC valve terminal is operated with several pres
sure zones (see Fig.3/1).
External pilot air
If the operating pressure lies below 3 bar or above 8 bar, you
must operate the pilot control of the valve solenoid coils with
external pilot air. For this purpose the pilot air is supplied
externally via connection 12/14.
Please note
·
Use closed−loop controlled external pilot air (3 ... 8 bar).
Reliable, faultless operation of the valve terminal is then
possible, e.g. even with fluctuating operating pressure.
·
The external pilot air for all valve solenoid coils is sup
plied centrally via pilot connection 12/14 on the left−
hand or right−hand side of the base block. This also
applies when the CPA−SC valve terminal is operated with
different pressure zones (see Fig.3/1).
·
Set the external pilot air to correspond to the operating
pressure (see diagrams in appendix A Technical data").
Summary of Contents for Smart cubic CPA-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPASC EN en 0412b...
Page 16: ...Contents and general instructions XIV Festo P BE CPASC EN en 0412b...
Page 17: ...Summary of components 1 1 Festo P BE CPASC EN en 0412b Chapter 1...
Page 41: ...Fitting 2 1 Festo P BE CPASC EN en 0412b Chapter 2...
Page 53: ...Installation 3 1 Festo P BE CPASC EN en 0412b Chapter 3...
Page 81: ...Commissioning 4 1 Festo P BE CPASC EN en 0412b Chapter 4...
Page 98: ...4 Commissioning 4 18 Festo P BE CPASC EN en 0412b...
Page 99: ...Maintenance and conversion 5 1 Festo P BE CPASC EN en 0412b Chapter 5...
Page 112: ...5 Maintenance and conversion 5 14 Festo P BE CPASC EN en 0412b...
Page 113: ...Technical appendix A 1 Festo P BE CPASC EN en 0412b Appendix A...
Page 129: ...Index B 1 Festo P BE CPASC EN en 0412b Appendix B...
Page 130: ...B Index B 2 Festo P BE CPASC EN en 0412b Contents B Index B 1...
Page 136: ...B Index B 8 Festo P BE CPASC EN en 0412b W Weights A 4...