A. Technical appendix
A−10
Festo P.BE−CPV−DI02−EN en 0704NH
A.2.4
Transferring input and output data
Data_Exchange
The cyclic exchange of data is accomplished with the
function Data_Exchange.
With this function the output data for CPI systems is trans
mitted as an octet string of length x. The octet string length
depends on the number of identifier bytes.
No
te
With the function Data_Exchange, the CPI system expects
the
o
ut
p
ut
d
a
t
a
for the valves and electric outputs.
The
in
p
ut
d
a
t
a
are sent to the master as a reply telegram.
A.2.5
Read diagnostic information
Slave_Diag
The diagnostic data are requested by the CPI system via the
function Slave_Diag (see section 3.2.4, Diagnosis via
PROFIBUS−DP).
Set_Prm
With the function Set_Prm you can determine the watchdog
time (WD_Fact_1, Octet 2, WD_Fact_2, Octet 3). In the event
of a fault the CPI system switches off all valves and electric
outputs after the parametrized time (e. g. if there is a bus
failure).
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...