4. Commissioning CPV−CS02 (ABB CS31)
4−3
Festo P.BE−CPV−DI02−EN en 0704NH
4.1
Pr
e
p
a
r
in
g
t
h
e
C
PV D
i
r
e
c
t
for
c
o
mm
i
ss
i
o
nin
g
4.1.1
Switching on the operating voltages
No
te
Please observe also the switching−on instructions in the
manual for your controller.
When the controller is switched on, it automatically carries
out a comparison between the NOMINAL and the ACTUAL
configurations. For this configuration run it is important that:
the specifications for the field bus configuration are
complete and correct.
the power supplies for the programmable logic controller
and for the field bus slaves are switched on either simul
taneously or in the sequence indicated below.
Observe the following points before switching on the power
supply:
Common supply
Common power supply for the control system and all field
bus slaves via a central power unit or a central switch.
Separate supply
If the control system and the field bus slaves have separate
power supplies, the devices must be switched on in the
following sequence:
1. the operating voltage supply for all field bus slaves
2. the operating voltage supply for the controller.
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...