4. Commissioning
4−15
Festo P.BE−CPX−CMA X−SYS−EN en 0908NH
Positioning jobs
After switching on the operating voltage, it must be waited
until the CMAX is completely installed, signals no error
(see Fig.4/1) and delivers the inputs SCON.ENABLED and
SCON.OPEN logic 1. Afterwards, the corresponding position
ing job can be executed via the control bytes (module out
put data) (see section 4.5 and the CMAX communication
profile" description).
Homing after POWER ON
Only with incremental position measuring systems:
After the CMAX operating voltage is switched on again, the
relationship between measured variable and current position
is lost. For that reason, homing must always be carried out
after switching on again.
After switching on the power supply, only the positioning
commands homing (CPOS.HOM), jog (CPOS.JOGx) and the
movement test are permissible for incremental displacement
encoders. Other positioning commands lead to error E10
(Drive is not referenced").
Summary of Contents for CPX-CMAX-C1-1
Page 2: ......
Page 22: ...Contents and general safety instructions XX Festo P BE CPX CMAX SYS EN en 0908NH...
Page 23: ...CMAX system overview 1 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 1...
Page 31: ...Fitting and pneumatic installation 2 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 2...
Page 60: ...2 Fitting and pneumatic installation 2 30 Festo P BE CPX CMAX SYS EN en 0908NH...
Page 61: ...Electrical installation 3 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 3...
Page 79: ...Commissioning 4 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 4...
Page 122: ...4 Commissioning 4 44 Festo P BE CPX CMAX SYS EN en 0908NH...
Page 123: ...Diagnostics and error handling 5 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 5...
Page 163: ...Technical appendix A 1 Festo P BE CPX CMAX SYS EN en 0908NH Appendix A...
Page 176: ...A Technical appendix A 14 Festo P BE CPX CMAX SYS EN en 0908NH...