3. Installation
3−27
Festo P.BE−CPASC−EN en 0808c
2. Valve terminal with PI or HC connection:
Connect the valve solenoid coils. The diagram below
shows the pin assignment of the cables Fig.3/11:
1
Red cable
Signal cable for
valve coil 14
2
Blue cable
Signal cable for
valve coil 12
3
Black cable COM
1 2
PI connector plug
HC connector plug
3
1
2
3
Fig.3/11: Wiring the valve solenoid coils
CPA−SC valve terminal with MP or FL connection
The multipin connection can be turned 90°.
Proceed as follows:
1. Press and hold the locking lug on the multipin connection
2. Swing the multipin plug into the desired position.
Further instructions on installing the electric components can
be found in the information supplied with the product.
Summary of Contents for CPA-SC Series
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPASC EN en 0808c...
Page 17: ...Summary of components 1 1 Festo P BE CPASC EN en 0808c Chapter 1...
Page 41: ...Fitting 2 1 Festo P BE CPASC EN en 0808c Chapter 2...
Page 55: ...Installation 3 1 Festo P BE CPASC EN en 0808c Chapter 3...
Page 85: ...Commissioning 4 1 Festo P BE CPASC EN en 0808c Chapter 4...
Page 102: ...4 Commissioning 4 18 Festo P BE CPASC EN en 0808c...
Page 103: ...Maintenance and conversion 5 1 Festo P BE CPASC EN en 0808c Chapter 5...
Page 116: ...5 Maintenance and conversion 5 14 Festo P BE CPASC EN en 0808c...
Page 117: ...Technical appendix A 1 Festo P BE CPASC EN en 0808c Appendix A...
Page 133: ...Index B 1 Festo P BE CPASC EN en 0808c Appendix B...
Page 134: ...B Index B 2 Festo P BE CPASC EN en 0808c Contents B Index B 1...