Festo PDAD-…-SP-12000 0807NH English | 19
13. Replace the cartridge assembly back
within the pressure housing.
14. Screw in banjo fixing bolt
6
. The
maximum tightening torque is 5 Nm.
15. Place one new O-ring
aB
from the
service package on both the top and
bottom valve assembly.
16. Place the pressure housing in the dryer.
Make sure that the pressure housing is
properly seated. The pressure housing
must fit the valve blocks properly.
17. The 4 fastening screws for the pressure
housing
3
must be screwed in so that
the pressure housing is fastened.
18. Repeat steps 6 to 17 until all desiccant
cartridges have been replaced.
6
aB
aB
3
3
Summary of Contents for 553749
Page 63: ...Festo PDAD SP 12000 0807NH 63...