![fesing FCIFP48100A Applications Manual Download Page 11](http://html1.mh-extra.com/html/fesing/fcifp48100a/fcifp48100a_applications-manual_2282399011.webp)
4. Battery Installation
This system must be installed by qualified, trained workers familiar with the required instruments.
Be sure to use insulated tools (torque wrench, extension, socket, etc.).
All the instruments must be insulated and no metal articles (e.g. watch,
ring) should be present in the installation area.
All power switches must be turned off in advance.
Prepare a CO
2
fire extinguisher, a first aid kit, and an AED (automated
external defibrillator) before installation.
Arc Flash and Shock Hazard
Insulated tools are required for any work on this energized equipment.
Sharp Edges
Wear gloves and other protective gear to prevent injury.
Pinch Point
Use caution when working in the enclosure to prevent injury.
Summary of Contents for FCIFP48100A
Page 1: ...Application Manual...
Page 26: ...www fns power com...