![fesing FCIFP48100A Applications Manual Download Page 10](http://html1.mh-extra.com/html/fesing/fcifp48100a/fcifp48100a_applications-manual_2282399010.webp)
6
External switch line
Battery external switch
7
Cabinet bolt
Fix the battery on the
rack or cabinet
Table 3-2: Recommended Tools and Instruments
No.
Items
Usage
Appearance
1
Phillips Screwdriver or Bit
To fasten battery and
assemblies
2
Box Cutter
Opening boxes
3
Insulated Torque Wrench
Installing cables and busbars
4
Insulated Sockets
Installing cables and busbars
5
Battery Tester
Measure battery module’s
voltage
3.2 Visual Inspection of the Modules
After transporting the modules to the installation location, check for:
Physical damage to the exterior
Damaged or protruding screws
Summary of Contents for FCIFP48100A
Page 1: ...Application Manual...
Page 26: ...www fns power com...