9
2.6
Assembly finish
1.
Mount the poke protection and re-attach the PE-cable to the
base plate.
2.
Attach the warning sticker on the poke protection.
3.
Commission the system, see section 3.
4.
Re-attach the PE cable to the baseplate before mounting the
front cover.
3
Commissioning
–
Start up
NOTE!
If this is the first time starting up the EnergyHub system
you need to follow the commissioning guide included with the
1.
Turn on the EnergyHub.
2.
Close the breaker on the ESS Power Case.
3.
Close the breaker on the ESS Battery and press the start
button for 5 seconds until it rings.
4.
When the system is on the battery will calibrate during the
first 24 hours. During this time, you should set the charge
reference to 1 kW in the system configuration
(
5.
After the calibration has finished you can configure the
battery in the system configuration after you desired use
case.