background image

20

5.6 VENTILATION AND AIR INTAKE

• 

In the cabin where the boiler is installed, we must ensure that we will have at all times the necessary air to guarantee 

a good combustion, in addition to optimal conditions of habitability within the enclosure.

• 

The outside air intake whenever possible should be connected to the room where the stove is installed. We must 

make sure that the entrance of outside air cannot be obstructed.

• 

If in the room where the stove is going to be installed we do not have enough natural ventilation, it will be essential 

to practice some opening, which guarantees us the necessary air from the outside (at least it should have a section 

of 100 cm2).

• 

Air can also be obtained from an adjacent room, provided that such flow can easily reach through

of permanent openings, which cannot be closed and which communicate with the outside.

• 

The premises cannot be used as a garage, material warehouse or activities with a risk of fire.

• 

The ventilation of the premises must satisfy the minimum flow required according to specific regulations and the flow 

rate of maximum intake air of the apparatus.

• 

Collective ventilation ducts are prohibited.

• 

The air intake must be placed respecting at least 500 mm both horizontally and vertically from the smoke outlet.

• 

The air intake for combustion cannot be connected to any air installation, nor is it recommended to take air directly 

from the outlet on the wall.

In the case in which there is no other way than to connect the primary air intake directly to the outlet practiced on the 

wall, it should be of a larger diameter, in order to avoid all the problems caused by the lack of primary air intake. The 

air intake practiced on the wall will not have any type of mosquito net or similar mesh since this decreases the entry of 

primary air to the device with the consequences that this implies in the ignition and operation of the same (Er41,  see  

Chapter 9 of this manual). 

The extension is  to be made as follows:

 

When the primary air intake in the equipment is Ø 60 mm we must expand to Ø 110  mm

 

   

 

IN THE CASE OF CHANNELING, AVOID ANY KIND OF ELBOW

 

IT IS TOTALLY FORBIDDEN THE INSTALLATION OF A COAXIAL TUBE IN 

ANY FERLUX EQUIPMENTS

.

SINCE COMPLIANCE WITH THE BEFORE MENTIONED IS BEYOND OUR CONTROL,  

FERLUX WILL  NOT BE RESPONSIBLE FOR ANY INCIDENT CAUSED BY THE BREACH  

OF THE MENTIONED POINTS.

Summary of Contents for HIDROMATIC

Page 1: ...Calidez de Vida hIDROMATIC AUTOMA TIC PELLET BOILER COD 0503 R1 INGL S...

Page 2: ...2...

Page 3: ...the extraordinary feeling of warmth in complete safety Please read this manual carefully as it contains important instructions regarding safety in installation use and maintenance This manual together...

Page 4: ...CIPLES 17 5 4 2 CALCULATION OF THE SMOKE OUTLET PIPE 18 5 4 3 INSTALLATION IN TRADITIONAL TYPE CHIMNEYS 19 5 4 4 OUTER SECTION OF CHAMIN 19 5 4 5 TERMINATION OF THE SMOKE OUTLET 19 5 5 VENTILATION AND...

Page 5: ...LE 32 6 2 DISPLAY SCREEN 2 35 7 BOILER OPERATION AND USE 35 7 1 ADVICE AND WARNINGS 35 7 2 FUEL LOADING 36 7 3 STARTING UP 36 8 CLEANING AND MAINTENANCE 37 RESET SERVICE 37 9 PROBLEMS MESSAGES AND ALA...

Page 6: ...and 5 so that you can easily find the section to consult to solve the questions and doubts that may arise When we read or consult this manual we will consider that Special attention should be paid to...

Page 7: ...tual is excluded for damage caused to people animals or things due to installation adjustment and or maintenance errors This boiler should only be used for what it has been expressly intended for Cert...

Page 8: ...ified and or unskilled personnel Use not in accordance with security policies Modifications and repairs not authorized by the Manufacturer performed to the equipment Use of non original or unspecified...

Page 9: ...m3 N 11 99 5 21 Average concentration of particles at 10 OR2 at rated power mg m3 N 15 79 17 07 Performance at minimum useful power 96 96 CO concentration at 10 O2 at minimum power mg m3 N 123 43 173...

Page 10: ...wer mg m3 N 10 92 10 39 7 42 Average concentration of particles at 10 OR2 at rated power mg m3 N 19 11 19 88 18 88 Performance at minimum useful power 95 97 96 CO concentration at 10 O2 at minimum pow...

Page 11: ...11 1503 1503 930 93 177 252 100 6 0 605 837 837 622 622 837 1603 702 1603 702 60 120 240 367 93 1030 684 837 MODEL HIDROMATIC 12 18 KW MODEL HIDROMATIC 24 30 35 KW...

Page 12: ...the Austrian standard norm M7135 one of the most restrictive standards on the market ENplus is also issued by an institute that certifies that the pellet complies with the EN 14961 2 standard Main re...

Page 13: ...FOR THE PRODUCT The use of inadequate fuel causes Accumulation of pellet in the burner Dirt on the burner and smoke evacuation ducts Bad combustion Decreased boiler performance Increased fuel consump...

Page 14: ...the responsibility of the end user in accordance with the relevant laws to store dispose of and eventually recycle the packaging 5 2 LOCATION The boiler will be installed so that it is not necessary t...

Page 15: ...mp connected to the drainage network The boiler should not be installed in rooms or areas where flammable or explosive products can be stored The installation of the boiler must ensure that the hydrau...

Page 16: ...mable or heat sensitive coatings are in place Periodic cleaning of the boiler and the smoke ducts must be carried out since the soot and other accumulated combustion residues could enter into combusti...

Page 17: ...ality The internal section of the smoke evacuation duct should be uniform and preferably circular In the event that we had a square or rectangular section the edges should be rounded with a minimum ra...

Page 18: ...allowed for vertically installed duct has been calculated with a maximum of two 90 bends and practically no horizontal section only to cross the wall if necessary If the installation is different from...

Page 19: ...for periodic maintenance The chimney must go up to the summit and the requirements of section 5 3 must be met Log cleaning Door access to the registry Max 250 mm Cap 120 mm Insulator Log cleaning Ins...

Page 20: ...of maximum intake air of the apparatus Collective ventilation ducts are prohibited The air intake must be placed respecting at least 500 mm both horizontally and vertically from the smoke outlet The...

Page 21: ...ith a closed expansion vessel The expansion vessel incorporated in the boiler does NOT guarantee adequate protection from thermal expansions suffered by water throughout the installation Therefore it...

Page 22: ...tion phenomena The water characteristics on the installation are very important for the proper functioning and duration of the boiler One of the most notable drawbacks is the fouling on the heat excha...

Page 23: ...tional pressure Automatic adaptation for constant pressure Proportional pressure 1 Proportional pressure 2 Proportional pressure 3 max Constant pressure 1 Constant pressure 2 Constant pressure 3 max C...

Page 24: ...or sharp parts that may deteriorate it The power outlet must be single phase with phase neutral and grounding If the mains voltage is not sinusoidal such as generator sets or other equipment the boil...

Page 25: ...ich is fully tactile 08 36 Thu 09 Sep 2021 KEY FUNCTION DESCRIPTION P1 ON OFF With this button we proceed to the on off the boiler P2 CONFIGURATIONS Through this key you access the menu settings both...

Page 26: ...09 Sep 2021 P4 Power Season Winter Operation Chrono Pellet OFF From this main screen if we want to see the history of errors that the boiler has we press the Button I of error information as shown be...

Page 27: ...p 2021 Next the device goes to the power on phase where the first screen we will see is the CHECK UP status as indicated in the following image 08 36 Thu 09 Sep 2021 OFF In the same way is the procedu...

Page 28: ...of working the boiler Endless calibration and fan calibration are two options that we do not recommend using since the boiler is configured from the factory and designed so that by the Conforluxsyste...

Page 29: ...e has been done we stop the counter and proceed to the ignition Manual loading of the auger should also be done when the hopper has completely run out of fuel or when cleaning and maintenance is done...

Page 30: ...shown in the sequence of images below Keyboard Settings Date and time Language 11 35 Thu 07 Oct 2021 Date and time 0 9 3 3 0 5 A g o 2 0 1 9 1 0 3 4 0 6 S e p 2 0 2 0 1 1 3 5 0 7 O c t 2 0 2 1 1 2 3...

Page 31: ...ghtness Standby screen Screen Saver Control panel address In this screen you can set up customize the appearance that you want our control panel to present 6 1 4 INFORMATION In this section we access...

Page 32: ...low we show the daily schedule which we will choose if what we need is a different on and off for each day of the week DAILY PROGRAMMING You can program the boiler for any of the week days With the op...

Page 33: ...ng hours of the boiler WEEKLY PROGRAMMING The boiler can be programmed only once for all days of the week With the option of three non matching time slots for on and off that is three different non ma...

Page 34: ...have three time slots for each modality WEEKEND PROGRAMMING You can schedule the boiler only once for all days of the week from Monday to Friday and another different schedule for the end of week With...

Page 35: ...ou are sure which procedure to follow Pay special attention to the alarms and messages that are displayed on the display it is even advisable to take note of them in this way we will facilitate the wo...

Page 36: ...mmends always having it at least half load After a long period of inactivity it will be necessary to remove the remains of pellets from the fuel tank since these could have absorbed moisture changing...

Page 37: ...while we have an error on the screen we will not be able to start the boiler 8 CLEANING AND MAINTENANCE For the proper functioning of the boiler it is essential to carry out certain maintenance tasks...

Page 38: ...sional or S A T authorized to perform IT if they have not been recently carried out the maintenance work that is marked in the table shown below LACK OF CLEANLINESS COMPROMISES THE SAFETY AND PROPER F...

Page 39: ...f the problem continues plese call the Technician The screen does not turn on Check that the voltage reaches the plug see if the back switch is on the switch fuse may be blown etc 9 2 MESSAGES MESSAGE...

Page 40: ...the status Lock ALARM CODE DESCRIPTION POSSIBLE CAUSE SOLUTION Er01 Body Temperature Safety Thermostat Intervention There has been a prolonged power outage Water does not circulate correctly through t...

Page 41: ...correct operation Missing or damaged smoke probe Check the condition of the boiler and do cleaning if necessary In case of repeating this alarm often and or not being able to reset it notify the S A...

Page 42: ...e hopper and the pellet does not reach the endless The load auger has been stuck and or charging motor does not rotate IF THE BRAZIER HAS BEEN LEFT FULL OF PELLET urns burned Wet or poor quality pelle...

Page 43: ...mum airflow has not been reached during the Check up check We could have a problem in the smoke outlet The air inlet is totally or partially plugged or has been channeled and has a lot of pressure los...

Page 44: ...44 Error 12 Power Failure Slide to Unlock When this message is displayed in the control panel the boiler is ready to unlock and restart Slide as indicated on the screen and unlock...

Page 45: ...ville Tel fono telefone telephone t l phone Pa s pais country pays VENDEDOR VENDEDOR SELLER VENDEUR Denominaci n del aparato Denomina o do aparelho Equipment name D nomination de l ppareil Referencia...

Page 46: ...ejercitar los derechos conforme a esta Garant a Comercial el consumidor dispone de las siguientes v as de reclamaci n E mail ferlux ferlux es Web www ferlux es Direcci n Pol gono el Polear parc 1 C P...

Page 47: ...47...

Page 48: ...Chimeneas y Barbacoas FERLUX S A Parque Empresarial El Polear Parc 1 29313 Villanueva del Trabuco M LAGA Espa a www ferlux es e mail ferlux ferlux es...

Reviews: