Fenix AT-06 Instructions Manual Download Page 13

13

13

ENGLISH

4. HOW TO USE

1. Place the lifting tower over a firm and flat 

surface on its working place.
2. Remove the outriggers (H) from their 

transport supports (C) and insert them into 

their working positions (G) checking that 

they are fixed by the safety pins (K). The lon-

gest ooutriggers must be placed at the front, 

under the load.
3. Adjust the outrigger stabilisers (J) by tur-

ning the cranks (I) to level the lifting tower. 

Ensure it is in a vertical position checking the 

bubble level.
4. Place the forklifts (E) in a horizontal po-

sition and secure them with the safety pins.
5. Place the load as close to the lifting tower 

as possible.
6. Elevation: Turn the winch handle (B) cloc-

kwise to lift the load until the wished posi-

tion, checking that the safety pins (A) are 

activated (T).
7. To avoid lifting tower overloading, do not 

separate uneccessarily the line array from the 

body of the lift. See fig. 2 (page 15). Follow 

loading instructions. See fig. 3 (page 15).
8. Lowering: release the safety pin (A) doing 

the step U. To release them, turn slightly the 

winch handle to elevate the load. In the nor-

mal working position, the load’s weight does 

not allow to release the safety pins. Once the 

safety pin (A) is unblocked, turn the winch 

handle (B) anticlockwise until the load is

 lowered and the second profile is completely 

down. Release the safety pins (A) and keep 

on lowering the lifting tower until the third 

profile is completely down. Unblock the sa-

fety pin (A) and continue lowering the lifting 

tower until it is completely folded at its mini-

mum height.
9. For the lifting towers’ transport it is neces-

sary to bring down all the profiles, releasing 

the safety pin (A) doing the step U. Fix the 

profiles with the safety pins (A) in the posi-

tion (S) and fix them with the transport sup-

port (F).

5. MAINTENANCE

1. Periodically check cable status. If the ca-

ble seems to have broken wires or crushing, 

replace immediately with a new one. Never 

use the lifting tower with cables in bad con-

ditions. Only use galvanized steel under EN 

12385-4. Cable maximum load: 2.000kg. Ca-

ble torsion resistance: 1.770N/mm². Cable 

diameter: 6mm. Cable composition: 6x19+1.
2. The lifting tower is supplied fully greased 

from factory. Nevertheless, the crown gear of 

the winch, to the threaded bar of the stabili-

ser outriggers and the profiles, because of its 

use periodical greasing is recommended.

WARNING:

DO NOT GREASE OR LUBRICATE BRA-

KING  MECHANISM

Braking disks were greased with a special 

heat and pressure resistant grease. No other 

product must be used to prevent negative in-

fluence on brake functioning.
3. Lifting tower AT-06, must be checked by 

an expert a minimum of once a year as per 

its use.

4. Only original spare parts must be used to 

ensure continued safe use. The user loses all 

guarantee rights if spare parts other than the 

originals are incorporated or the product is 

modified in any way.
5. To request any spare part, contact the 

manufacturer or an authorised distributor 

within your territory.

A

B

C

K

F

E

H

J

I

S

T

U

Fig. 1

Summary of Contents for AT-06

Page 1: ...Serial No Instrucciones Instructions LIFTING TOWERS Fabricante Manufacturer FENIX Stage S L Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Spain Tel 34 96 125 08 55 export fenixstage com w...

Page 2: ...2 2 2 2...

Page 3: ...RE ELEVADORA Modelo AT 06 Descripci n Altura m xima 6 50m Altura m nima 1 97m Carga m xima 250kg rea de la base abierta 1 66 x 1 72m rea de la base cerrada 0 48 x 0 48m Peso 107kg Cabestrante 900kg de...

Page 4: ...sions Fecha Date Verificador Verifier Firma Signature Partes comprobadas Tested parts Conclusiones Conclusions Fecha Date Verificador Verifier Firma Signature Partes comprobadas Tested parts Conclusio...

Page 5: ...3 p g 8 seguir las instrucciones de uso ver punto 4 p g 9 un manteniminto peri dico ver punto 5 p g 9 conocer los sistemas de prevenci n ver punto 7 p g 10 BGV C1 is a regulation for staging and pro d...

Page 6: ...DE SEGURIDAD 8 4 INSTRUCCIONES DE USO 9 5 MANTENIMIENTO 9 6 RIESGOS ESPEC FICOS 10 7 SISTEMAS DE PREVENCI N 10 INDEX 1 INTRODUCTION 11 2 GENERAL DATA 11 2 1 Technical data 11 2 2 Applicable regulation...

Page 7: ...inaci n TORRE ELEVADORA Modelo AT 06 Caracter sticas t cnicas Altura m xima 6 50m Altura m nima 1 97m Carga m xima 250kg Carga m nima 25kg Material Aluminio seg n AL Si 6082 T6 rea de la base abierta...

Page 8: ...elevadora ni apoyarlas en l para realizar ning n tipo de trabajo Tenga cuidado con todo tipo de salientes por encima de la torre elevadora como cornisas balcones letreros luminosos etc Es muy importa...

Page 9: ...al m ximo el segundo tramo Liberar el gatillo de seguridad A y seguir bajando la torre hasta que el tercer tramo baje al m ximo Desbloquear el gatillo de seguridad A y seguir bajando la torre elevado...

Page 10: ...estructurales mal funcionamiento de siste mas de seguridad sistemas de sujeci n etc 7 SISTEMAS DE PREVENCI N Sobre fallo del sistema de freno Disponer de cabestrante conforme a las nor mas mencionadas...

Page 11: ...T 06 Technical characteristics Maximum height 6 50m Minimum height 1 97m Maximum load 250kg Minimum load 25kg Material Aluminium AL Si 6082 T6 Open base area 1 66 x 1 72m Closed base area 0 48 x 0 48m...

Page 12: ...lifting tower or lean against it for any kind of work Beware of any kind of projection above the lifting tower like cornices balconies luminous signs etc It is very important to avoid the presence of...

Page 13: ...e is completely down Unblock the sa fety pin A and continue lowering the lifting tower until it is completely folded at its mini mum height 9 For the lifting towers transport it is neces sary to bring...

Page 14: ...tions metioned in the BGV C1 directive spe cially DIN EN ISO 12100 2011 03 and DIN EN ISO 12100 1 2004 04 About loss of stability Maintenance of lifting tower stability must basically be as per the f...

Page 15: ...15 Distancia Distance Carga m xima Maximum load 20cm 250kg 45cm 190kg Distancia del centro de la carga a la torre Distance from the center of the load to the tower 20 45...

Page 16: ...16 A 1 A 2 A 3 A 4 A 7 A 5 A 6...

Page 17: ...17 2333 3078 3076 1069 3076 1308 2046 2046 1302 X4 3013 1031 3013 1054 1031 X2 3081 3080 1310 3082 3029 3028 3030 3039 1817 1026 1026 3089 A1...

Page 18: ...18 1063 1021 x4 1404 x4 2043 1311 1410 1306 x4 3102 3051 1031 x2 1026 x2 1091 x2 1406 x3 1308 x3 1306 x4 1404 x4 1406 x2 1308 x2 3091 3143 2300 2301 2302 2303 A2 A3 A4 1...

Page 19: ...0 4019 1031 x2 1130x2 1082 3068 4023 1190 1130 4005 1306x2 1408 1308 1082 3086 4012 1308 1841 1039 2315 1815 1813 1813 1815 4006 4004 4003 4002 4001 1802 3351 1082 3086 1406 1308 1068 3013 1017 1303 1...

Page 20: ...2885 2886 A 2337 2338 1039 1406 1308 1820 1825 3088 1102 1310 1310 x4 1408 x4 1056 x4 3070 1310 1056 4054 1004 3069 3042 1021 1302 1305 2052 1028 3044 1305 4203 2328 3441 1253 3426 A 4031 3427 3463 A6...

Page 21: ...21 NOTAS NOTES LIFTING TOWERS...

Page 22: ...22 NOTAS NOTES LIFTING TOWERS...

Page 23: ...23 NOTAS NOTES LIFTING TOWERS...

Page 24: ...FENIX Stage S L Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Spain Tel 34 96 125 08 55 export fenixstage com www fenixstage com...

Reviews: