6. SPECIFIC RISKS
Braking system failure

May occur due to braking system deficien-

cies or bad installation. If it stops working 

it could cause a serious risk due to the rai-

sed load being out of control and may injure 

users or hit materials next to the tower. 

Loss of stability

If the tower is placed on a sloping ground or 

a surface that is not completely flat, there is a 

risk of losing stability which would lead to a 

90º overturn with risk of serious injuries for 

workers.

Objects dropping to a different level

As an elevation equipment and due to its 

working height, there is a serious risk of 

raised objects dropping to a different level, 

either due to securing mechanism failure, 

part wear, dirt, etc., or incorrect use of the 

lifting tower (E.g.: for goods over the maxi-

mum load allowed). Sudden drop of raised 

goods implies a serious risk for the worker. 

Knocks and/or contusions due to objects

This risk only occasionally causes an accident 

to the worker running the operation due to 

his location during the elevation process; the 

risk of knocks from a raised element is more 

likely to affect people walking by or whose 

workplace is next to the lifting tower.

Its origin may be due to a loss of stability, 

malfunctioning of structural elements, safety 

systems, securing systems, etc.

7. PREVENTION SYSTEMS
About braking system failure

Equip with winch complying with regula-

tions metioned in the BGV C1 directive, spe-

cially DIN EN ISO 12100:2011-03 and DIN 

EN ISO 12100-1:2004-04.

About loss of stability

Maintenance of lifting tower stability must 

basically be as per the following measures: 

• Professionalization, training and risk 

awareness of lifting tower users.

• Equip with different safety devices and ad-

vices from the manufacturer to reinforce sta-

bility, as: 

- Safety pins which secure the lifting tower 

once raised.

- Bubble level to help vertical adjustment.

- Maximum load specification that the lifting 

tower can raise.

- Maximum slope specification which the lif-

ting tower can access safely. 

About objects falling to a different level, 

knocks and/or contusions with objects

The risk of objects falling to a different level 

can be prevented by using homologated safe-

ty elements, e.g., a safety pin which fixes the 

inner profile of the lifting tower in its wor-

king position, so the cable does not support 

load and guaranteeing the impossibility of a 

drop. In the event of cable breakage, the bra-

king system will act automatically. Further-

more, if steel elements have been zinc coated 

it protects the entire unit from oxidation and 

corrosion.

These risks can also be minimised with co-

rrect lifting tower maintenance. The user 

must perform periodical inspections on sa-

fety elements and make the necessary repairs 

in case deficiencies are detected.

Moreover, the consequences of these risks 

can be reduced limiting an access area to the 

lifting tower and with a correct training of 

personnel.

About noise emissions

This equipment doesn’t produce more than 

80 dB.

Summary of Contents for AT-04

Page 1: ...rie Serial No Instrucciones Instructions Fabricante Manufacturer FENIX Stage S L U FENIX Stage S L U Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Spain Tel 34 96 125 08 55 export fenixst...

Page 2: ...2 2 FENIX STAGE S L U Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Spain...

Page 3: ...nuestra exclusiva responsabilidad la conformidad del producto Nombre Modelo Descripci n al que se refiere esta declaraci n con las disposiciones de la normativa de maquinaria CE 2006 42 EG y sus modif...

Page 4: ...sions Fecha Date Verificador Verifier Firma Signature Partes comprobadas Tested parts Conclusiones Conclusions Fecha Date Verificador Verifier Firma Signature Partes comprobadas Tested parts Conclusio...

Page 5: ...p g 8 seguir las instrucciones de uso ver punto 4 p g 9 un manteniminto peri dico ver punto 5 p g 10 conocer los sistemas de prevenci n ver punto 7 p g 11 BGV C1 is a regulation for staging and pro d...

Page 6: ...E SEGURIDAD 8 4 INSTRUCCIONES DE USO 9 5 MANTENIMIENTO 10 6 RIESGOS ESPEC FICOS 10 7 SISTEMAS DE PREVENCI N 11 INDEX 1 INTRODUCTION 12 2 GENERAL DATA 12 2 1 Technical data 12 2 2 Applicable regulation...

Page 7: ...naci n TORRE ELEVADORA Modelo AT 04 Caracter sticas t cnicas Altura m xima 5 00m Altura m nima 1 59m Carga m xima 200kg Carga m nima 25kg Material Aluminio seg n AL Si 6082 T6 rea de la base abierta 1...

Page 8: ...elevadora ni apoyarlas en l para realizar ning n tipo de trabajo Tenga cuidado con todo tipo de salientes por encima de la torre elevadora como cornisas balcones letreros luminosos etc Es muy importa...

Page 9: ...ga Ver fig 3 p g 17 7 Elevaci n Para elevar los perfiles hay que seguir un orden concreto El primer perfil que hay que subir siempre ser el m s aleja do del cabestrante Liberar el gatillo de segu rida...

Page 10: ...os de carga E en posici n vertical y bajar el ca rro X girando la manivela del cabestrante B ejerciendo un poco de presi n sobre el carro X Meter las patas H en su sopor te para transporte C ajustando...

Page 11: ...N Sobre fallo del sistema de freno Disponer de cabestrante conforme a las nor mas mencionadas en la directiva de seguri dad BGV C1 especialmente DIN EN ISO 12100 2011 03 y DIN EN ISO 12100 1 2004 04 S...

Page 12: ...AT 04 Technical characteristics Maximum height 5 00m Minimum height 1 59m Maximum load 200kg Minimum load 25kg Material Aluminium AL Si 6082 T6 Workspace 1 45 x 1 49m Closed base area 0 38 x 0 48m We...

Page 13: ...lifting tower or lean against it for any kind of work Beware of any kind of projection above the lifting tower like cornices balconies luminous signs etc It is very important to avoid the presence of...

Page 14: ...loading instructions See fig 3 page 17 7 Elevation To lift the profiles a specific or der must be followed The first profile to be raised will always be the one located furthest from the winch Release...

Page 15: ...he safety pins A in closed position S Move the forklifts E in vertical position and lower the carriage X by turning the winch handle B and pressing down a little on the carriage X Place the outriggers...

Page 16: ...tions metioned in the BGV C1 directive spe cially DIN EN ISO 12100 2011 03 and DIN EN ISO 12100 1 2004 04 About loss of stability Maintenance of lifting tower stability must basically be as per the f...

Page 17: ...17 Distancia Distance Carga m xima Maximum load 20cm 200kg 45cm 160kg Distancia del centro de la carga a la torre Distance from the center of the load to the tower Figura 2 Figura 3 20cm 45cm...

Page 18: ...18...

Page 19: ...19...

Page 20: ...20...

Page 21: ...21...

Page 22: ......

Page 23: ...23 NOTAS NOTES LIFTING TOWERS...

Page 24: ...FENIX Stage S L U FENIX Stage S L U Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Spain Tel 34 96 125 08 55 export fenixstage com www fenixstage com www fenixstage com...

Reviews: