background image

                                                                            FeiYu Tech 

Guilin Feiyu Electronic co.,Ltd          http://www.feiyu-tech.com      Email:[email protected] 

  4 

 

necessary, loosen the screw(s) to properly fit the pieces. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Step  3:    Welding  (soldering)  the  frames  to  the  bottom  fuse  plate 

with the electronics. 

To accomplish this you will need a small soldering iron aprox. 35w. 

Plug  in  the  soldering  iron  and  while  it  is  coming  to  temperature,  gather  your  Rosen  Core  solder  and 

safety glasses. 

With the soldering iron at  temp. place  the  tip on  the bottom  fuse weld point,  making sure that the tip 

makes  contact  with  both the  frame and  fuse  weld points.    Apply solder at this  point,  you  will  notice 

that the solder will wik (Flow) smoothly and make a gusset.    Make sure  you don

t have a cold solder 

joint.    I needed, reheat the joint.    Use caution as not to Over Heat the solder joints as this will cause 

the metal to curl up and away from the contact point. 

Follow this process for the remaining points.     

Now remove the top Fuselage plate, this will gain you access to the weld points inside and between the 

Frames. 

Once inspected and sure that no cold  solder joints are there.    Connect  a 3S  Lipo Balance plug  to the 

plug on the bottom of the Fuselage. 

You  should  have  all  the  led

s  lit  and  the  bottom  will  light  up  White  and  will  flash  for  a  few  seconds 

 

Cross any two wire , 
change Motor rotation

 

welding

 

ESC 

Fuselage  with 

Electronic 

components 

Magic  cable 

tie 

through 

square 

groove 

M3

×

25mm Pillar 

 

Summary of Contents for Y6

Page 1: ...td Rm B305 Innovation Building Information Industry Park Chaoyang Road Qixing District GuiLin CN h p w ww fei y u tech com Email feiyudz yahoo cn FeiYu Y6 scorpion Copter Frame Instruction Manual Plea...

Page 2: ...R 5 Airborne period 10mins with 3S 2200mAh battery 6 Cell Chemistry 3S 1500mAh 5000mAh Lithium Polymer and instant discharge capacity 15C Support PWM normal ESC 7 Can install FY91Q needs at least 4 ch...

Page 3: ...d on out side Unpack the Frames separate them as to color of l e d s i e Blue Red Green Remove the m3x5mm button head screws Remove the m3x30mm pillars Unpack the four motor mount plates Unpack the fo...

Page 4: ...all be lined up Step 2 Building the Fuselage and attaching and Welding the Frames to the Fuselage Unpack the three Frame assemblies You will notice that they are marked with an A on one side and a B...

Page 5: ...will notice that the solder will wik Flow smoothly and make a gusset Make sure you don t have a cold solder joint I needed reheat the joint Use caution as not to Over Heat the solder joints as this w...

Page 6: ...y Step 4 Installing the ESC s and the Battery connector Take the six esc s out of their package This is an important step to be observed On five of the esc s remove the Red positive lead from the serv...

Page 7: ...udz yahoo cn 6 Propeller installation Pay attention to the installation of the propeller direction END 2 3 6 5 1 Front 4 Y6 SCORPION FLYER 1 top ESC 1 CW 2 top ESC 2 CW 3 top ESC 3 CW 4 bottom ESC 4 C...

Reviews: