FeiYu Tech
Guilin Feiyu Electronic co.,Ltd http://www.feiyu-tech.com Email:[email protected]
3
m3x5mm button head screws. Lay this aside.
Take four m3x30 mm pillars, using the allen wrench and m3x5mm button head screw, attach the four
pillars to the holes in the side frame. Make sure that the led
’
s are facing to the outside. Take the
opposite side frame making sure the led
’
s are facing outwards and the Weld points are on the same end.
Do not tighten the screws yet, Now take the motor with it
’
s mount and position it in the bottom slots
that are cut in the side frames, snug down the button head screws for the motor. Now take the landing
gear and position it so the long end is pointing down. Now tighten all eight button head screws.
Go through the same procedure for the remaining three frames.
Inspect the assemblies to be sure that all the motors and the landing gears are seated properly.
When assembled properly, the Feiyu Tech Logo
’
s will be facing upright and the Welding points will all
be lined up.
Step 2:Building the Fuselage and attaching and Welding the Frames
to the Fuselage.
Unpack the three Frame assemblies. You will notice that they are marked with an
“
A
”
on one side
and a
“
B
”
on the other. The important one is the one with the Electronics mounted on it. Take eight
m3x25mm pillars and secure them with the button head screws . Make sure that the electronics are
facing up and the led plug is on the bottom. Take another fuselage plate in one hand and with the
other take a frame assembly, place the assembly with the weld points pointing down and insert it in the
slots provided on the electronics fuselage.
Take four button head screws and the fuselage plate and align the plate with the holes for the pillars,
making sure that the other die cut holes line up properly. Lightly screw the three button head screws
into the pillars, now take the remaining Frames and place them in the slots provided.
Once all frames are inserted into the top and bottom Fuselage plates, tighten the four button head
screws and insert the remaining four screws and tighten them as before.
Inspect the Frames and make sure that the weld points are seated snugly in their locations. If