Kernbohren Metall
Assembly
C-SC_CSSM
Version 1.0
01.04.2019
Page
53
of
89
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
9.1.3 Positioning the guide
Steps that must be completed:
-
Assembling the spider
-
Positioning the spider
Tool(s):
-
PH2 cross-head screwdriver
-
Slotted screwdriver
-
Socket head wrench, 2.5 mm, 3 mm, 4 mm
1.
Position the pressure piece (
1
).
2.
Unscrew the twelve screws (
2
).
3.
Remove the two guide rails.
2
1