12
GIS 75
EN
Mounting instructions.
Fasten the machine onto the GRIT GISB under-
carriage (see mounting instructions). The fasten-
ing of both the undercarriage to the floor and
the machine to the undercarriage must be suita-
ble to withstand the forces occurring during
working.
Use appropriate screw connections (size,
length) for mounting.
Electrical connection.
The electrical connection, which is to be
provided by customer, must be carried out
by a qualified electrician.
Observe mains voltage:
The mains voltage and
the frequency of the power source must agree
with the data on the type plate of the machine.
Before starting operation for the first time,
check the rotation direction of the motor. The
rotation direction may be changed only by a
qualified electrician.
Adjustments.
Before any work on the machine itself, pull
the power plug from the socket outlet.
Adjusting the spark guard (4).
➤
Loosen both wing bolts (5) and adjust the
spark guard (4) in such a manner that the
grinding belt is covered as far as possible.
➤
Tighten both wing bolts again.
Adjusting the grinding rest (6) (Figure 1).
➤
Loosen star-knob bolt (9) and adjust the gap
size to
2 mm (max.)
.
➤
Tighten the star-knob bolt again.
Adjusting the face- grinding rest (18).
For face grinding applications, the face- grinding
rest (18) must be aligned parallel to the grinding
belt and must touch it over the complete sur-
face.
➤
Loosen screw (20) and fold the side
cover (21) down.
➤
Loosen screws (10) and align the face-grind-
ing rest (18). Tighten the screw (10) again.
➤
Shut the side cover (21) and tighten
screw (20) again.
Check the gap size at the stop (3).
(Figure 2)
Adjusting the belt tracking.
Switch the machine on only
briefly
and check the belt track-
ing.
If the grinding belt moves left or
right, adjust the belt tracking
with the star-knob bolt (13) until centred.
If the belt tracking cannot be adjusted centred:
➤
Clean the drive wheel (19) and the contact
wheel (17) with compressed air.
➤
Check the drive wheel and the contact
wheel for wear, deformation and damage.
Have damaged components replaced with-
out delay!
Changing the grinding belt.
Before any work on the machine itself, pull
the power plug from the socket outlet.
➤
Loosen screw (20) and fold the side
cover (21) down.
➤
Loosen star-knob bolt (8) and remove the
dust collector (7).
Push belt tension lever (11)
down to release the clamping
device.
➤
Remove the old grinding belt.
Before attaching the new grinding belt, observe
the information concerning the running direc-
tion on the inner side of the grinding belt! It
must correspond with the running direction of
the drive wheel.
➤
Place the grinding belt both around the drive
wheel (19) and around the contact
wheel (17).
Push the belt tension lever (11)
up again to tension the grinding
belt.
3 94 10 013 000 - GB Seite 12 Mittwoch, 15. November 2006 2:49 14
Summary of Contents for GRIT GIS75 Series
Page 4: ...4 max 2 mm 6 9 1 2 3 4 max 2 mm 5 GIS75 Titel book Seite 4 Mittwoch 15 November 2006 1 19 13...
Page 41: ...GIS 75 41 EL BGV A2 BGR 500 GIS75 Titel book Seite 41 Mittwoch 15 November 2006 1 19 13...
Page 87: ...GIS 75 87 RU BGV A2 BGR 500 GIS75 Titel book Seite 87 Mittwoch 15 November 2006 1 19 13...