![Fein FSC1.6Q Manual Download Page 8](http://html1.mh-extra.com/html/fein/fsc1-6q/fsc1-6q_manual_3889378008.webp)
All rights reserved by FEIN, especially in case of industrial rights registration.
Any power of disposition such as copying and right of transfer is situated with FEIN.
Sahre / MVK 04 / 13
FEIN REPAIR TOOLS
8/49
2.4. Repair and maintenance intervals
After approx. 300 operating hours:
•
Dismantle machine, clean, and blow out or brush down insulating parts,
replace spherical bearing (500)
Depending on type and duration of use, but at least every 6 months:
•
Dismantle machine
•
Clean machine thoroughly
•
Replace bearing (armature)
•
Clean electronics (dry cleaning only)
•
Check cable and inner stranded wires for chafe marks
•
Check that plug contacts are snugly fitting
•
Replace spherical bearing (500)