10) Assemble Picket Panels:
Using
the F screws, attach pickets to the
top rail insert and then to the
bottom rail to make up a Picket
Panel for each infill section.
11) Install Assembled Picket Panels:
Lift the completed picket
panels (assembled top rail insert, bottom rail & pickets)
into position on the frame by first tilting-in the bottom rail
on top of the RCBs and then rotating the top of the picket
panel inward. The top of the panel should just clear the
bottom of the top rail. At this point you should be able to lift
the entire panel up by the top rail insert and snap it into
place inside the top rail. Use two H screws to fasten the
bottom rail to each RCB. Pre-drill these holes with a
9/64”drill bit before attaching screws, as the wings of the
RCBs tend to flex when pushed by the H screw. Also, be sure to
slightly offset opposing screw holes so that the screws
do not hit one another inside the RCB.
This will complete a Picket System assembly.
H
Screws
F Screw
F
Screw
TOP RAIL INSERT
ATTACHMENT
BOTTOM RAIL
ATTACHMENT