INSTALLATION, OPERATION, & MAINTENANCE
ChromaSteam
®
X
INSTALLER
Installing the Fixture
To Install the Fixture:
1.
Connect the ChromaSteamX fixture’s pigtail to the 30-foot LED power cable in the junction box
(Figure 11).
IMPORTANT NOTE:
Test that the fixture operates correctly prior to continuing with the following steps.
2.
Clean the surface of the ceiling to ensure the double-stick adhesive of the fixture bonds
completely to the ceiling.
3.
Peel off and discard the protective layer from the fixture’s double-stick adhesive
(Figure 12)
.
4.
Squeeze the retention springs on the back of the fixture and fit them into the junction box
(Figure 13)
. Insert
the fixture into the junction box and affix it to the ceiling, being careful not to pinch the pigtail/LED power
cable (note that the pigtail/control LED power cable is not shown in
Figure 13
. Press firmly around edges of
the fixture to ensure adhesion to ceiling.
5.
Apply a bead of silicone around the perimeter of the fixture
(Figure 14)
as required to create a moisture seal
between the fixture and the steam room ceiling. Use tape or other means as required to keep the fixture in
position as the silicone cures, for 24 hours.