TECHNICAL CHANGES RESERVED
Feed Mill Services & Equipment BV
– Tel. +31 (0)493 310 059 – www.feedmillservices.eu
- 14 -
5.3 Maintenance Instructions
Daily maintenance:
- Check the machine's business situation completely, especially the conduction rails
lubrication system
- Keep the workbench clean. A clean workplace is safer and more pleasant.
Weekly maintenance:
- Check on traces of wear, which can be visually identifiable by product/machine
damage
Other maintenance:
- Filling the reservoir. Fill the tank with clean oil (Viscosity oil: VG 46) to the maximum
level. This can be done by unscrewing the steel sheet and removing it from the frame.
- The first service must be carried out 100 operating hours after commissioning, in which
case the filters must be replaced and the oil checked. Furthermore, the entire installation
must be carefully checked. Follow the following points for attention:
- After the first service, major maintenance must be carried out after 300 operating hours
and then every 500 running hours, or sooner after the load and the operating conditions,
but in any case annually.
- The filters and the oil must be replaced with great maintenance.
Figure 5.3.1
Aggregate at the bottom of the workbench