background image

 

E. 

Strobe Power Supply Fuse Replacement.

 

High voltages are present inside the lightbar. 

Wait at least ten (10) minutes, after shutting 

off power, before servicing this unit. Failure 

to do so may result in property damage, seri-

ous injury, or death to you or others.

Disconnect ALL power to the lightbar before any 

maintenance is performed.

 

 

Replace the fuse on the power supply’s top with 

an EXACT replacement. The 15A fuse for the primary 

strobe power supply is Federal Part No. 148A142-06.

 

F. 

Strobe Power Supply Replacement.

 

High voltages are present inside the lightbar. 

Wait at least ten (10) minutes, after shutting 

off power, before servicing this unit. Failure 

to do so may result in property damage, seri-

ous injury, or death to you or others.

Disconnect ALL power to the lightbar before 

any maintenance is performed.

 

 

Other than the fuse, the strobe light power sup-

ply does not contain any user serviceable parts. Should a 

breakdown in the power supply occur, it should be returned 

to Federal for repair and replaced. To remove the power 

supply, proceed as follows:

 

 

1. 

Unplug the connectors from the power sup-

ply.

 

 

2. 

Remove the four #8 screws which secure 

the power supply. 

 

 

3. 

Install the new power supply by perform-

ing the previous steps in reverse order.

290A5493

LED ASSEMBLY

Figure 5.

LED MODULE

290A5494

REMOVE AND

REPLACE SCREWS

Figure 6.

 

G. 

LED Assembly Replacement.

 

A serious injury may result if LED assembly 

is touched when hot. Always allow LED as-

sembly to cool before removing.

 

 

1.   Man Down LED.

 

 

 

See figure 5. Refer to table 2 and replace the 

defective LED assembly with an exact replacement only.

 

 

2.  Gen-3 LED.

 

 

 

See figure 6. Refer to table 2 and replace 

the defective LED assembly with an exact replacement 

only.

Copyright 2006 Federal Signal Corporation

-6-

Reviews: