-17-
LEVEL 5 Load Shed Sequence
Always leave the
Slide Switch OFF
while
reconfiguring.
Previously shed loads can be re-
stored manually by pushing the as-
sociated keys.
Press key 16 “Reset (No Shed)” to
reset the load manager. After this
key is pressed and saved, no load
shedding will occur.
IMPORTANT
Determining which loads are man-
aged is a critical decision. It is sug-
gested that only non-critical relays
are managed. It is the user's respon-
sibility to determine which loads are
managed.
manager will NOT shed relays
which are NOT in the shedding se-
quence.
Eight relays, Aux Relays 1-3 and Aux
Relays A-E, can be programmed as
load managed outputs. The load
manager will shed the programmed
relays in the shedding order when
the vehicle is shifted into PARK and
the battery voltage drops below the
reference voltage (shedding thresh-
old voltage) for 30 seconds or more.
If the High Idle Control is enabled,
High Idle will activate to remedy the
low battery condition before load
shedding begins. Previously shed
loads are NOT restored if the bat-
tery voltage rises above the refer-
ence voltage. Previously shed loads
are ONLY restored at 0.5 second in-
tervals in reverse sequence when the
vehicle is shifted out of PARK.
Level 5 - Load Shed Sequence is
where you decide which relays
should shed (turn off) and the shed-
ding sequence.
SAVE
Save LEVEL 5 - Load Shed Se-
quence settings and return to Level
5, Load Management, page 16.
Load Shed Sequence
To reconfigure the Load Shed Se-
quence, press the Aux Relay keys
one at a time in the desired shed-
ding sequence order. The order in
which the keys are pressed is the
shedding sequence. Press only the
keys which correspond to the relays
which need to be managed. The load
SmartSystem-LMS
SAVE
9
10
11
12
13
14
15
16
4
5
6
7
8
20
19
17
18
Reset
(No Shed)
Aux. Relay
3
Aux. Relay
2
Aux. Relay
1
Aux. Relay
A
Aux. Relay
B
Aux. Relay
C
Aux. Relay
D
Aux. Relay
E
290A3887
OFF
1