![Federal Signal Corporation 2001-AC Installation And Operation Manual Download Page 25](http://html1.mh-extra.com/html/federal-signal-corporation/2001-ac/2001-ac_installation-and-operation-manual_3804598025.webp)
2001-AC
19
Service and Maintenance
5. Activate the Wail function. Check for proper rotation and sound output of siren.
After confirming that the installation is complete and it has been established that
the siren is operating properly, Federal Signal recommends that all control
devices be padlocked to discourage tampering and vandalism.
Troubleshooting Checklist
Electrocution or severe personal injury could occur when working on
this equipment. Service should only be performed by personnel familiar
with 240 VAC power and only after reading this manual.
The following checklist should be completed if the unit fails to operate properly.
Table 1 Troubleshooting Checklist
Check
Questions
Are there any visible signs of damage?
What type of control unit is being used?
•
FC
•
2001HR
•
AR
•
OTHER
Does the unit operate from the control unit?
Do K1 and K2 operate?
Is F1 open?
Are the main AC breakers tripped?
What is DC voltage supplied between F1 and TB1?
What is voltage supplied to the Transformer/Rectifier primary?
Summary of Contents for 2001-AC
Page 2: ...2001 AC Copyright 2016 Federal Signal Corporation...
Page 4: ...2001 AC Website http www alertnotification net...
Page 17: ...2001 AC 11 Installation Instructions Figure 4 Motor Starter Enclosure Parts List...
Page 19: ...2001 AC 13 Installation Instructions Figure 6 Typical Wiring Diagram...