
9.
Use the screw (A) to assemble the foldable right shelf weld assembly to the main
burner assembly (01), shown as n the illustration above.
10.
Firstly pre-assemble 3pcs screws (M6*16), and fix the left side burner assembly,
then use 2pcs screws A to fix the side burner assembly, at the same time to
tighten up the preassembly screws, shown as below.
9.
10.
35
A
Screws are Pre-installed
3pcs M6x16
A
2PCS
Screws are pre-installed
3 pcs M6x16
2PCS
Screws are Pre-installed
3pcs M6x16
2PCS
A
A
10
Screws are pre-installed
3 pcs M6x16
2PCS
12
Assembly
Summary of Contents for CHEF'S Special 4.1
Page 26: ...26 Notes ...
Page 27: ...fccbbq com 27 Notes ...