![Fayat Group BOMAG BP 12/40 Operating Instructions Manual Download Page 22](http://html1.mh-extra.com/html/fayat-group/bomag-bp-12-40/bomag-bp-12-40_operating-instructions-manual_3696886022.webp)
Operation
BOMAG
23
BP 12/40, BP 20/50, BP 25/50
Fig. 17
l
As the engine warms up open the lever (Fig.
17) of the chocke bit by bit.
Fig. 18
l
Move the throttle lever (Fig. 18) back to idle
speed position.
i
Note
Run the engine warm for approx. 1 to 2 minutes in
idle speed.
Operation of the vibratory plate can be started as
soon as the engine responds to short throttle com-
mands.
Fig. 19
l
If the engine stops again after approx. 3 to 5
seconds, close the choke again with the lever
(Fig. 19) and repeat the starting process.
!
Caution
For short breaks you should always return the
throttle lever to idle speed position, this avoids
premature wear of the centrifugal clutch.
Engine "drowned"
i
Note
When the choke is closed and the starter rope is
pulled several times, the engine draws in too much
fuel and will probably not start.
Remedy
l
Close the fuel cock.
l
Open the choke.
l
Set the throttle lever to full speed position.
l
Operate the recoil starter until the engine
starts.
i
Note
If the engine does not start after 10 to 20 attempts
l
Open the choke.
l
Set the throttle lever to full speed position.
l
Pull off the spark plug socket.
l
Unscrew the spark plug.
l
Operate the starter several times.
Go
to
Discount-Equipment.com
to
order
your
parts