PAGE OF
6
8
Prop posts labelled 'E' & 'F' into the foundation hole. Loosely secure post 'K' & 'M' to posts 'E' & 'F' using the supplied Coach
Bolts. Attach the other ends of posts 'K' & 'M' to the triangle deck frame with the supplied Coach Screws as illustrated.
E
F
NOTE: The Dimensions for the pre-drilled holes below are mearly a reference to using
the correct hole on the upright post. If made to the correct these posts won't require drilling.
SECURE USING
M12 X 220 COACH BOLTS
SECURE USING
M12 X 150 COACH SCREWS
K
M
E
F
3
2
5
.0
4
6
5
.0
1
0
1
.5
4
4
5
.0