![FAWNS Playtime PICUS Installation Instructions Manual Download Page 11](http://html1.mh-extra.com/html/fawns/playtime-picus/playtime-picus_installation-instructions-manual_546847011.webp)
PAGE OF
5
8
Prop post labelled 'K' into the foundation hole. Loosely secure post 'G' to posts 'J' & 'K' using the supplied Coach Screws.
Ensure the horizontal log is positioned on the deck side of the two upright posts. Attach post 'B' to the pre-driled hole under
post 'G' onto post 'K' The other side of post 'B' is secured to the triangle deck post using a Coach Screw (as positioned
below).
G
I
D
NOTE: The Dimensions for the pre-drilled holes below are purely a reference to using the
correct hole on the upright post. If made to the correct these posts shouldn't require drilling.
SECURE USING
M12 X 230 COACH BOLTS
SECURE USING
M12 X 220 COACH BOLT
SECURE USING
M12 X 150 COACH SCREW
C
1
9
5
.0
6
0
0
.0
M
A
X
4
9
0
.0