background image

Woodcot Court, 2A Woodcot Gardens, Farnborough, Hampshire GU14 9RD    Tel: 01252 515199   Fax: 01252 515858

http://www.fawns.co.uk   mail:[email protected]

No part of this document may be copied or used without the express written permission of FAWNS RECREATIONAL SERVICES LTD (c) FRS 2014

PICUS

PICK UP STICKS 'TWO' (SF)

PICUS2(SF)

FFH

SIZE

AGE RANGE

PROD. CODE

L:3.16M x W:4.42M x H:1.50M

600MM

3-5 YEARS OLD

TECHNICAL DATA

MINIMUM SPACE REQUIRED

SUPERVISED PLAY

EQUIPMENT TYPE

LARGEST PART

RECOMMENDED

HEAVIEST PART

6.10M X 6.70M

LOW LEVEL

2100MM X 125MM DIA

15.5KG

INSTALLATION DETAILS

1. READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLATION OF UNIT
 
2. EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT
 
3. ENSURE TO CHECK AND TIGHTEN ALL FIXINGS USING PROTECTIVE CAPS WHERE NECESSARY
 
4. BACKFILL FOUNDATIONS WITH              CUBIC M CONCRETE ALLOWING TO SET FOR 48 HOURS
 
5. REMOVE ALL ASSEMBLY AIDS BEFORE THE EQUIPMENT IS USED

0.062

THIS PRODUCT CONFORMS WITH BS EN1176-    :2008

1

Date:

Version: A

01/06/16

PAGE     OF  

1

4

& BS EN1176- 3 :2008

Summary of Contents for Playtime PICUS

Page 1: ...REQUIRED SUPERVISED PLAY EQUIPMENT TYPE LARGEST PART RECOMMENDED HEAVIEST PART 6 10M X 6 70M LOW LEVEL 2100MM X 125MM DIA 15 5KG INSTALLATION DETAILS 1 READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLATION OF UNIT 2 EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT 3 ENSURE TO CHECK AND TIGHTEN ALL FIXINGS USING PROTECTIVE CAPS WHERE NECESSARY 4 BACKFILL F...

Page 2: ...350 X 350 X 600 DEEP UNLESS OTHERWISE SPECIFIED 846 779 592 1050 780 693 1051 858 1567 963 842 339 1258 3 801 3 801 3 1348 6 867 4 1586 1 1585 1 1029 1 849 3 1537 9 1447 8 1137 9 1249 6 1537 9 900 X 350 X 250 DEEP 1496 495 600 600 ...

Page 3: ...7 292 352 1899 913 1222 1060 608 1107 608 1528 626 1111 253 604 1045 696 438 513 1386 350 1098 215 6779 6085 22 5 SQ METRES WETPOUR SURFACING 18 5 LINEAR METRES WETPOUR EDGING 1211 3 1050 2 1067 5 910 3 839 6 987 0 841 5 1035 5 1052 2 953 1 ...

Page 4: ...PAGE OF 4 4 5500 7000 1452 2 1775 6 1178 0 1292 7 1165 5 22 GRASS SAVER TILES 1 5M X 1 0M ...

Page 5: ...2 20 05 15 PAGE OF 1 1 A 20 05 15 AK 500 0 100 0 6 45 0 R100 0 5 1 4 50 0 MIN 2 KEY 1 POST 2 STEEL GROUND SHOE 3 BOTTOM OF POST 4 FINISHED SURFACE LEVEL 5 TOP OF FOUNDATION 6 CONCRETE FOUNDATION 7 HARD STANDING STEEL GROUND SHOE INSTALLATION Excavate the foundation hole in accordance to each products individual specification sheet Each steel ground shoe is supplied pre attached to the unit post Po...

Page 6: ...teel ground shoe is supplied pre attached to the unit post Position the post into the foundation hole to the required depth NOTE As illustrated it s essential a distance of 50mm is maintained from the finished surface level to the underside of the timber post LOOSEFILL SURFACING 500 0 300 0 50 0 MIN 100 0 7 4 ...

Page 7: ...ECK 4 1 FRPE00663 PICUS3 HDPE PANEL 5 1 FAHR 600 POLY SLIDE GREEN FAHR 600 POLY SLIDE 6 1 FRMT01023 GROUND ANCHOR SCRAMBLE NET 7 4 SSB505090R 50 X 50 X 125 DIA POST BRKT 8 4 M10X40BHSS M10 x 40 Socket Button Head SS 9 7 M10X70CHS M10 x 70 Hex Coach SS 10 9 M10X120CHS M10 x 120 Hex Coach SS Parts List ITEM QTY PART NUMBER DESCRIPTION 11 5 M12X150CS M12 X 150 COACH SCREW 12 1 M12X200CB M12 x 200 Coa...

Page 8: ...guide NOTE Do not fully tighten the Washer Screws until the unit has been assembled SURFACE LEVEL A A A O O SLIDE DETAIL A The counterbore holes will point in the direction of an opposite post foundation as illustrated with the arrows in Detail View B The counterbore will be on the opposite side to the arrow head With the three posts formed secure the triangle deck frame to the three upright posts...

Page 9: ... the HDPE slide frame secured attach the slide steel bracket using the supplied Button Head Screws A drill hole may have to be created to go through the timber deck so the steel bracket can attach securely to the HDPE panel and the Triangle Timber Deck Now secure the slide assembly to the HDPE frame and the steel support bracket With the deck assembly complete and the correct shape achieved concre...

Page 10: ...ecure post labelled H to the lower hole on post B and fix using the supplied Coach Bolt The upper end of post H is fixed to post A on the triangle deck using a Coach Screw to the dimension shown below Repeat this same process for post labelled C but with the second hole from ground level on post I H B I J C SURFACE LEVEL With Posts H I bracing the upright posts secure post J to the pre drilled hol...

Page 11: ... under post G onto post K The other side of post B is secured to the triangle deck post using a Coach Screw as positioned below G I D NOTE The Dimensions for the pre drilled holes below are purely a reference to using the correct hole on the upright post If made to the correct these posts shouldn t require drilling SECURE USING M12 X 230 COACH BOLTS SECURE USING M12 X 220 COACH BOLT SECURE USING M...

Page 12: ...K M to the triangle deck frame with the supplied Coach Screws as illustrated E F NOTE The Dimensions for the pre drilled holes below are mearly a reference to using the correct hole on the upright post If made to the correct these posts won t require drilling SECURE USING M12 X 220 COACH BOLTS SECURE USING M12 X 150 COACH SCREWS K M E F 325 0 465 0 101 5 445 0 ...

Page 13: ...securing with M10 X 120 Coach Screws NOTE Post N Sits on the underside of an existing log and is secured with an M12 x 200 Coach Bolt The hole for this Coach Bolt will need to be positioned and drilled prior to being able to attach post N DRILL COACH BOLT POST TO UNDERSIDE Use the illustrated dimensions as a reference to locate the timber horizontals In the correct place SECURE USING M12 X 220 COA...

Page 14: ...TTACH THE ROPES Finally with the structure complete the ropes can be secured to the correct upright posts With the unit loosely connected the posts should be able to lean to the desired angle and to achieve tension in the ropes Once the ropes have been secured the fixings can be tightened and concrete can be added to the foundations Leave concrete to set for 48 Hours J J 250 0 800 0 700 0 ...

Reviews: