PAGE OF
9
9
With all posts now secured in place, secure the final post 020 onto posts 013, 017 & 019 using the supplied Coach Screws. As with any Coach Screw
attachment
ensure a 8mm pilot hole is drilled prior to prevent the timber from splitting.
007
013
017
019
020
Finally the ropes can be added to the unit. Below is a description of the ropes and which posts they are attached to. With the ropes loosely attached, the
posts can be adjusted to ensure that the ropes are fully tensioned.
With all of the ropes secured, add concrete to the foundation holes and leave for 48 hours. When the concrete has set all fixings can be fully tightened and
protective caps can be installed.
PARALLEL ROPE
(attaches to posts 005, & 008)
SHORT ROPE
(attaches to posts 002, & 015)
SCRAMBLE ROPE
(attaches to post 014 and ground anchor)
TRAPEZE ROPE
(attaches to post 010)
LONG ROPE
(attaches to posts 005, 001, 007 & 004)