Dry DuraPlacer DP9D / DP13D / DP14D
Page ix
Inspections
Pre-Delivery
After the machine has been completely assembled, inspect it to be sure it is in good running order
before delivering it to the customer. Ensure each item is found satisfactory or proper adjustment
to the item(s) is made.
The following checklist is a reminder of points to inspect. It is neither an exclusive nor an
exhaustive list of points to inspect. See the
o
SMV
emblem is installed, protective
shipping tape
is removed from reflectors, and
lights
are installed.
o
All
grease
fittings
Manual.)
o
Inspect to be sure all
nuts
are tightened to proper torque and all
cotter pins
are spread.
o
The
tires
).
o
Wheel bolts
are tightened to their specified torque(s).
o
Fertilizer
row units
are properly adjusted.
o
Warning
lights
are properly installed and operational.
o
All customer-ordered
attachments
are installed or are available for delivery.
o
Any parts scratched in shipment are touched up with
paint
.
o
All
shipping decals
are removed.
o
Transport pins
are inserted in the transport holes.
This machine has been thoroughly checked and to the best of my knowledge is ready for delivery
to the customer.
Signed: _________________________
Date: _________________________
Summary of Contents for DP9D
Page 1: ...DP9D DP13D DP14D 40 60 OWNERS MANUAL DRY DURAPLACER OWNERS MANUAL 2023...
Page 2: ...820070 Dry DuraPlacer 9 13 14 Ton 40 60 2023 09 27...
Page 7: ...Dry DuraPlacer DP9D DP13D DP14D Page v...
Page 29: ...SAFETY SAFETY Dry DuraPlacer 9 13 14 Ton 40 60 Page 13 Wing C B A A C B A B A B...
Page 30: ...SAFETY SAFETY Dry DuraPlacer 9 13 14 Ton 40 60 Page 14 Main Frame Wheel and Tracks...