AXLES, TIRES, and TRACKS
AXLES, TIRES, and TRACKS
Boom Sprayer 9500 / 9600
Page 64
Check Track Alignment
1.
Prior to checking track alignment, the implement should be empty and spring tensioning
mechanism set properly with no pre-load.
2.
Pull the implement on a flat surface for a suitable timeframe allowing the belts to relax and
move freely on the undercarriage rollers.
3.
Drive in a straight line for roughly 200 ft and coast the tractor to a stop. Place the tractor
in PARK and apply the emergency brake. Do not apply braking action during this process
as sudden stops can affect track position during the alignment process.
4.
Using a ¼” x 4” x 8” shim (A) slid between the front mid-roller and guide lugs (B). Bridge
guide lugs with the shim maintaining pressure on a minimum of 2 lugs.
5.
If the shim fits freely between the lugs and mid-roller on both sides of the undercarriage,
the alignment is correct. It the shim binds and does not fit between the mid-rollers / guide
lugs, track adjustment is necessary.
Summary of Contents for 9500
Page 1: ...9500 9600 60 132 BOOM SPRAYER OWNER S MANUAL...
Page 2: ...820083 9500 9600 60 132 Boom Sprayer 2023 11 21...
Page 9: ...Table of Contents Boom Sprayer 9500 9600 Page 9...
Page 38: ...SAFETY SAFETY Boom Sprayer 9500 9600 Page 38...
Page 39: ...SAFETY SAFETY Boom Sprayer 9500 9600 Page 39...
Page 40: ...SAFETY SAFETY Boom Sprayer 9500 9600 Page 40 Decal Images...
Page 41: ...SAFETY SAFETY Boom Sprayer 9500 9600 Page 41...
Page 42: ...SAFETY SAFETY Boom Sprayer 9500 9600 Page 42 Wheel and Tracks...