Inspections
3PT Sprayer 973PT
Page 11
Inspections
Pre-Delivery
After the machine has been completely assembled, inspect it to be sure it is in good running order
before delivering it to the customer. Ensure each item is found satisfactory or proper adjustment
to the item(s) is made.
The following checklist is a reminder of points to inspect. It is neither an exclusive nor an
exhaustive list of points to inspect. See the
o
SMV
emblem is installed, protective
shipping tape
is removed from reflectors, and
lights
are installed.
o
All
grease
fittings
are lubricated (see
LUBRICATION and MAINTENANCE
section in this
Manual.)
o
Inspect to be sure all
nuts
are tightened to proper torque and all
cotter pins
are spread.
o
The
tires
).
o
Wheel bolts
are tightened to their specified torque(s).
o
Fertilizer
row units
are properly adjusted.
o
Warning
lights
are properly installed and operational.
o
All customer-ordered
attachments
are installed or are available for delivery.
o
Any parts scratched in shipment are touched up with
paint
.
o
All
shipping decals
are removed.
o
Transport pins
are inserted in the transport holes.
This machine has been thoroughly checked and to the best of my knowledge is ready for delivery
to the customer.
Signed: _________________________
Date: _________________________
Summary of Contents for 973PT
Page 1: ...973PT 120 132 3PT SPRAYER OWNER S MANUAL...
Page 2: ...820071 973PT 120 132 3PT Sprayer 2023 12 01...
Page 33: ...SAFETY SAFETY 3PT Sprayer 973PT Page 33...
Page 34: ...SAFETY SAFETY 3PT Sprayer 973PT Page 34 Main Frame...
Page 35: ...SAFETY SAFETY 3PT Sprayer 973PT Page 35...
Page 57: ...SPRAYER CALIBRATION SPRAYER CALIBRATION 3PT Sprayer 973PT Page 57 Table 3 Common conversions...
Page 58: ...SPRAYER CALIBRATION SPRAYER CALIBRATION 3PT Sprayer 973PT Page 58 Table 4 Nozzle flow rates...