![FarmTRX Yield Monitor Install Manual Download Page 11](http://html1.mh-extra.com/html/farmtrx/yield-monitor/yield-monitor_install-manual_545511011.webp)
Using the step-drill-bit to drill ¾” hole
Showing: step-drill bit used.
6.
Use a file to remove sharp burs from the drilled hole.
7.
Mount the sensor brackets: Slide head of sensor into the new ¾” hole. Loosen jam nuts
on sensor and slide the bracket until the 4-hole pattern is located in the middle of the
clean grain elevator. Press the head of the sensor into the ¾” hole, hold the bracket at
90 degrees to the vertical edge of the elevator, and mark the 4-hole pattern of the
bracket for drilling.