7. After cutting panel to proper width, measure and cut
two sections of H-channel to correct length. H-channel
is used to join two separate panels.
Install H-channel
with flat side out.
8. Install one section of H-channel along each panel edge.
Install H-channel flush with panel bottom.
9. Measure between
edges of H-channel
at panel bottom
and cut a section of end cap profile (104548) to fit
between H-channel.
10. Install end cap profile on bottom of small panel.
When
installed, it will overlap top of door frame.
11. Using Tek screws (no washers), secure panel in place
above door by installing a screw through center of
H-channel and into frame member. Install flat side out.
Install UV-protected side of panel to the outside.
Measure Width
(center-to-center)
END PANEL INSTALLATION (continued)
NOTE:
H-channel to remain below top of rafter and
short enough to allow for installation of roof panels and
H-channel.
12. Repeat the steps to prepare and install the final 6' x 10'
panel for this end wall.
13. Place panel in position with its UV-protected surface to
the outside and attach to end wall framing.
End Cap
104548
H-channel: Install
flat side out.
Trimmed polycarbonate panel
above the door.
6. Take the 4' x 8' panel and cut a section to cover above
door. Prepare as previously described. Remember to
account for installation of adjacent panel and H-channel
between panels. Actual frame may differ.
Cut from a 4' x 8'
panel.
Install H-Channel
here.
ATTENTION:
Space screws and washers at 16" on-
center. Install vent tape along bottom of panels.
U-Profile attached to panel
along door edge.
6' x 10'
6' x 10'
Secure end panels to all vertical end frame tubes and to the