Visit
www.FarmTek.com
for additional products and customer assistance.
WEATHERSHIELD AWNINGS
8
ASSEMBLE THE MAIN ROOF FRAME (ALL LENGTHS)
This section is an overview of the process for assembling
the roof frame. See illustration below to identify main parts
of the frame.
1. Locate the required couplers, rafter assemblies, and
purlin pipes to assemble the roof frame as shown
below.
2. Secure each pipe in the coupler using the locking
eyebolt. If the couplers are not equipped with locking
eyebolts, secure each pipe in the coupler using a Tek
screw.
3. Tape each rafter pipe joint to protect the cover when it
is installed.
ATTENTION
: Position Tek screws so they will not touch
the main covers or side panels (if equipped) when
these are installed.
Frame length shown may differ from actual frame.
Rafters
Purlins