background image

3

Revision date: 06.22.11

CARTS AND WAGONS

Parts List and Tools Required

To better align the rack, do not fully 

tighten the bolts until the entire rack 

is assembled.  

Position pipes so the 

countersunk hole is to the outside for 

bolt installation.

On a flat surface, assemble one end 

1. 

frame as shown. Insert pipes into 

each other until the spring-loaded 

button snaps into place.  
Using two (2) long bolts, and two (2) 

2. 

washers, secure the #6 Pipe to the 

end frame. 

 

NOTE:

 In some instances, the bolts 

included with the rack may all be the 

same length. Proceed as instructed 

and disregard the length references.
Thread a caster onto the end of each 

3. 

#1 Pipe.
Repeat the steps to assemble the 

4. 

remaining end frame.

1

RAFTER ASSEMBLY

Socket/Wrench Set

Pliers

Long Bolts (4)

Washers (4)

Casters (4)

#3 Pipe (2)

#1 Pipe (4)

#8 Pipe (2)

#2 Pipe (2)

#6 Pipe (2)

Diagram not to scale.

Caster

Caster

#1 Pipe

#1 Pipe

#2 Pipe

#6 Pipe

#8 Pipe

#3 Pipe

Long Bolt & 

Washer

Long Bolt & 

Washer

Summary of Contents for 103780

Page 1: ... WAGONS 1 Revision date 06 22 11 STK DIMENSIONS 103780 72 W x 73 D x 87 H 2011 FarmTek All Rights Reserved Reproduction is prohibited without permission 103780 EZ Grow Hanging Plant Display Transport Rack 10712 ...

Page 2: ... Do not overload the rack Position heavy plants on the bottom pipes only For best results place heavy plants near the ends of the pipes Always load rack evenly and on both sides Never place all plants on the same side Load must be balanced Never climb on the rack or use it as a ladder CARE AND MAINTENANCE Periodically check all fasteners to assure they are tight Clean the rack using water and mild...

Page 3: ...into place Using two 2 long bolts and two 2 2 washers secure the 6 Pipe to the end frame NOTE In some instances the bolts included with the rack may all be the same length Proceed as instructed and disregard the length references Thread a caster onto the end of each 3 1 Pipe Repeat the steps to assemble the 4 remaining end frame 1 RAFTER ASSEMBLY Socket Wrench Set Pliers Long Bolts 4 Washers 4 Cas...

Page 4: ...he middle of the rack to secure the 6 Pipes together Tighten all connections 3 Periodically check connections to make sure they are tight and secure Lock casters to secure 4 rack position when in use Do not allow casters to remain unlocked when rack is loaded 2 INSTALL CROSS PIPES Socket Wrench Set Pliers Medium Bolts 12 Washers 12 5 Pipe 1 4 Pipe 5 Diagram not to scale Medium Bolt Washer 4 Pipe 4...

Page 5: ...CARTS AND WAGONS 5 Revision date 06 22 11 Space below is reserved for customer notes ...

Reviews: