2. Installation sequence
ATTENTION:
please comply with all the safety rules before proceeding with the installation.
1. Run the cable starting from the battery towards the rear of the vehicle;
2. Fix the cable without interfering with moving parts and parts subject to high temperatures;
3. Fix the IBBC square bracket to the rear of the tractor;
4. Connect the G and N connectors to the IBBC connector in the cab side (K,L);
5. Stretch the cable towards the cabin;
6. Fix the CPC In-Cab connector (O) inside the cabin;
7. Connect the ACC wire (I) to an ignition point (+12V);
8. Check and fix the position of the relays (E,F);
9. Fix the eyelet (A) to the negative pole of the battery;
10. Fix the eyelet (B) to the positive pole of the battery.
3. Connections scheme
In-Cab cable
N
L
J
G
O
O
K
A
B
ISOBUS
implement
ISOBUS
implement cable
G7 Iso / G12
3
2
1
3.1 Connection to G7 / G12
In-Cab cable
(CBCYFG0200)
1.1 Content of the package
●Main Cable;
●IBBC connector;
●Metal bracket;
●Cab socket cable.
3
2
1
IBBC connector
Main cable
Cab socket cable
PIN-OUT
PIN n°
Function
1
Not connected
2
CAN-L
3
CAN-L
4
CAN-H
5
CAN-H
6
TBC-PWR
7
ECU-PWR positive
8
TBC-RTN
9
ECU-PWR negative
G12
G7 Iso bracket
Pin 1
Pin 4
Pin 7