17
Operation - 2895 Loader
For back grading, either load the bucket and
position the heel on the ground or position the
bucket at 40° or less below level as shown. Place
the valve in the float position and back up slowly.
Important: Float position must be used to reduce
down pressure, otherwise cylinder rod(s) and/or
bucket damage could occur.
A Frame:
Regular Duty / Heavy Duty 60"
Both A-frames are for handling medium to
large sized round bales (up to 2000 lbs) when
fitted with two bottom 1240mm long heat treated
spears and two short stabilizers. For pallet
applications with a maximum payload of 4400 lbs
when fitted with the 48.0” pallet fork kit.
Note: The heavy duty frame can also be fitted using
only the one center spear.
Summary of Contents for Allied 2895
Page 1: ...Operator and Parts Manual 122011 P4110 2895 Loader For serial numbers 0528950045 and later ...
Page 2: ......
Page 6: ...6 Specifications 2895 Loader Specifications ...
Page 31: ......
Page 36: ...36 Parts 2895 Loader Main Frame Assembly ...
Page 38: ...38 Parts 2895 Loader Hydraulic Plumbing Assembly ...
Page 40: ...40 Parts 2895 Loader Main Frame Assembly TSL ...
Page 42: ...42 Parts 2895 Loader Hydraulic Plumbing Assembly TSL ...
Page 49: ......